BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Springfield, Georgia. Completed plans call for site work for a playground / park / athletic field.

Effingham County is soliciting services to supply all labor, materials, and equipment to perform exterior painting of the steel structures at Clarence Morgan Sports Complex located at 1750 GA Highway 21 South, Springfield, GA 31329. Any questions pertaining to the bid must be made in writing online no later than 5:00 pm (Eastern Time) on Wednesday, May 8, 2024. No response will be given to any questions received after the stipulate deadline. All designated surfaces to be painted will be cleaned and prepared as necessary to receive new coatings in accordance with the standards identified in this Request for Quotations. Scope and Specifications: Surface Preparation & Painting Exterior Steel Structures, Clarence Morgan Sports Complex, Effingham County, GA The purpose of this Scope of Work is to identify the requirements for Surface Preparation and Painting of the Exterior Steel Structures at the Clarence Morgan Sports Complex, Effingham County, Springfield, GA. The project includes surface preparation and application of primer and paint to protect and enhance the appearance of the steel structures. Detailed Specifications: The contractor shall provide all labor, material, and equipment, necessary to properly prepare and paint the exterior steel structures at the Clarence Morgan Sports Complex, 1750 GA Highway 21 South, Effingham County, Springfield, GA. Painting of canopy decking or roofing shall not be included. Exterior painted areas will include: a. Steel cross beams and columns at 10 designated seating area canopies. b. Steel frame at five (5) designated scorekeeper stands. c. Steel cross beams and columns at one (1) designated pavilion canopy. d. Steel cross beams at batting cage. 1. All work shall be performed in accordance with industry best practices, the manufacturer's recommendations, and applicable local, state, and federal codes and regulations. 2. The paint system shall be of high-quality, designed to withstand the local weather conditions and adhere to the steel surface for an extended period. 3. The contractor shall conduct a thorough inspection of the existing paint system to identify any areas of damage, rust, or other surface defects. 4. All loose or flaking paint shall be removed by hand, mechanical sanding, or power tool cleaning methods, ensuring a clean, smooth, and sound surface for the new paint system. 5. All rusted areas shall be treated, prepared, and properly primed before paint application in accordance with the standards outlined herein. 6. Apply primer coat to metal surfaces as necessary with the exterior bonding primer. 7. Apply two (2) coats of exterior waterborne alkyd semi-gloss to designated metal surfaces.8. Access methodology may include surfaces being accessed through a man-lift and/or ladders. If other means are required to safely access paintable surfaces to complete the project, these means shall be indicated in the proposal. 9. All application shall be performed using brushes, rollers, or sprayers, as appropriate, to achieve a smooth, even finish. 10. The paint color to be provided by the contractor shall be "black" and shall be approved by the Effingham County Parks and Landscape Department prior to the start of the project. 11. The paint system shall consist of a minimum of two coats of high-quality exterior paint, ensuring complete coverage and protection of the steel structures. 12. Special attention shall be given to areas of high corrosion risk, such as joints, welds, and areas prone to water accumulation, to ensure thorough coating and protection. 13. All surfaces shall be inspected, and any touch-ups or additional coats required shall be performed before the completion of the project.

Award

Playgrounds / Parks / Athletic Fields

$56,975.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
23
Bidding Soon
396
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

1750 GA-21, Springfield, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Painting Exterior Steel Structures CEM Sports Complex

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.