BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Atwater, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of June 10, 2024 project was awarded to George Reed, awarded amount is 6,623,539.60.** The Base Bid for the project includes reconstruction of Fruitland Avenue from the intersection of Orchard Park Avenue to Winton Way, and Winton Way to approximately 140 east of the intersection of Capitola Avenue (approximately 7,160 lf, total). The Additive Alternate #1 for the project includes reconstruction of Fruitland Avenue from approximately 140' east of the intersection of Capitola Avenue, to the intersection of Shaffer Road (approximately 1,360 lf, total). Refer to the plans for the limits of the Base Bid and Additive Alternate #1 work. The City reserves the right to reject any BID if it is determined you are unqualified to carry out the obligations of the Agreement and to complete the work The general prevailing wage rates determined by the Director of Industrial Relations, for the county or counties in which the work is to be done, are available at the California Department of Industrial Relations' Internet Web Site at: http://www.dir.ca.gov/DLSR/PWD. These wage rates are not included in the Bid Book for the project. Changes in general prevailing wage determinations apply to the Contract when the Director of Industrial Relations has issued them at least 10 days before advertisement "Liquidated damages for all work are one-thousand dollars ($1000) per day." Bids must be on a unit price basis. All bids are to be compared on the basis of the CITY OF ATWATER'S estimated quantities of work to be done The estimated cost of construction is $7,179,370. (includes Additive Alternate 1) Each bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the CITY OF ATWATER for an amount equal to at least ten percent (10%) of the amount of bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. Complete all work identified in the Base Bid with 90 working days. In addition, the portion of the work between Orchard Park Avenue and Winton Way shall be substantially complete by August 2nd, 2024. An additional 30 working days will be awarded if Additive Alternate #1 is awarded, for a total of 120 working days

Award

Roads / Highways

$6,623,539.00

Public - City

Paving, Site Work

85

9

228

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
57
Bidding Soon
876
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 1, 2024

img_map_placeholder

Fruitland Ave, Atwater, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.