Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 13, 2024 at 8:00 PM
Updated July 14, 2024
Site work for a road / highway in Myakka City, Florida. Completed plans call for site work for a road / highway.
Counties: Manatee, Sarasota Road Name: Installation and Establishment of Landscaping Limits: 17070000 Project(s): 44068625201(*) Federal Aid No: N/A Project(s): 44998015201 Federal Aid No: N/A Total Roadway Length: 2.223 Miles Contract Days: 465 Total Bridge Length: 0.000 Miles Total Proposal Length: 2.223 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: The work under this Contract consist of installation and establishment of landscaping at SR 72 at Proctor Road Roundabout and SR 684 (Cortez Road) from 26th Street to 14th Street W in Sarasota and Manatee Counties. Experience in Landscaping is required. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 007 Installation and Establishment of Landscaping Question Deadline 05/09/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. Install and establish landscaping as indicated in the Contract Documents. The allowable Contract Time is two separate phases called Installation Period and Establishment Period. The Installation Period precedes the Establishment Period and is the allowable Contract Time minus the one-year Establishment Period. Regardless of the duration of the time used for the Installation Period, the duration of the Establishment Period will be one year. Edge, sweep, remove and dispose of vegetation and debris from curb and gutter and sidewalk areas including, but not limited to, median island curbs, roadside curbs, gutters, the front and backside and joint areas of sidewalks, bike paths, curb inlets throats and other areas as designated by the Engineer.
Award
Roads / Highways
$508,419.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2024
June 17, 2024
Multiple Locations, Myakka City, FL
Related To This Project
Myakka City, FL
--
Myakka City, FL
Bid Date: Jul 18 2024
Myakka City, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
