Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Kirkwood, Pennsylvania. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
As of June 5, 2024, bids received were rejected as the Township of Colerain will act as the prime contractor and sub out all of the work. The project is located at Morrison Mill Road's crossing of a Tributary to Coopers Run, approximately 0.25-mile northeast of Morrison Mill Road's intersection with Sproul Road. The coordinates of the site are 39 51' 08.5" N / 76 03' 23.2" W. The project consists of the replacement of an existing 60" diameter metal pipe culvert with an Aluminum Box Culvert having a span of 15' 4" and a rise of 6' 5". Also include in the project's scope of work will be the installation of roadway subbase and the installation of guiderail. A performance and materials bond must be provided before starting the work. Work must be completed within one hundred twenty (120) calendar days following the issuance of the Notice to Proceed. Colerain Township reserves the right to reject any or all bids or to waive any informality in the bidding.
Project Abandoned
Bridges / Tunnels
$172,977.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 26, 2024
June 6, 2024
Mill Road and Sproul Road, Kirkwood, PA
Related To This Project
Kirkwood, PA
Bid Date: Oct 16 2024
Kirkwood, PA
Bid Date: Apr 01 2024
Kirkwood, PA
Bid Date: May 02 2022
Kirkwood, PA
Bid Date: Sep 21 2021
Kirkwood, PA
--
Chesterbrook, PA
Bid Date: May 08 2024
Sheffield, PA
Bid Date: May 09 2024
Meyersdale, PA
Bid Date: May 14 2024
New Kensington, PA
Bid Date: May 07 2024
Ford City, PA
Bid Date: May 21 2024
Lower Burrell, PA
Bid Date: Apr 26 2024
Reading, PA
--
Fairview Township, PA
--
Northumberland, PA
Bid Date: May 16 2024
Waynesboro, PA
Bid Date: May 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.