Site work and paving for a mixed-use development in Huntington Beach, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of May 30, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Bid Valid 60 days after opening Liquidated Damages 1000 per calendar day Estimated Bid Value 3,750,000 Start/Delivery Date Project NTP shall start no later than Monday, July 8, 2024 Project Duration 120 working days License Requirements Class A Q&A Deadline 05/01/2024 4:00 PM (PDT) All questions related to this bid solicitation must be submitted through the City's online System Vendor Portal Edinger Ave (Countess to Saybrook) The project consists primarily of cold milling of the existing pavement, Cold In-placed Recycling of existing asphalt concrete, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, installing truncated domes, tree replacements, adjusting valves to grade, installing striping and signage. Talbert Ave (Edwards to West City Limits) The project consists primarily of cold milling of the existing pavement, Full Depth Reclamation of existing asphalt concrete, asphalt base paving, type II slurry, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, curb access ramps, cross gutters, tree replacements, installing composite manholes, and valves to grade, and installing traffic loops with striping and signage. Indianapolis Alley will be bid as an alternative and 20 additional working days will be added to the contract if the City includes the alley in the award of the project. Indianapolis Alley will be constructed by Friday, August 15, 2024. The project consists primarily of the removal of and replacement of the existing asphalt concrete pavement, concrete alley gutter, and concrete alley approaches, with ancillary work as necessary. The AGENCY reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a maximum period of 60 days. The undersigned agreesto complete the work within 120 working days, starting from the date of the Notice to Proceed

Award

Roads / Highways

$4,046,299.00

Public - City

Paving, Site Work

18

5

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
106
Bidding Soon
2,428
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

July 31, 2024

img_map_placeholder

Multiple Locations, Huntington Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.