Site work for a water / sewer project in Minnetrista, Minnesota. Completed plans call for site work for a water / sewer project.
Well Drilling/Pumphouses. The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components: CONTRACT NO. 1 - MINNETRSITA WELLS NO. 8 AND NO. 9 Construction of Municipal Well No. 8: Generally, includes constructing and developing one well, test pumping, and water analysis. The anticipated well design is 770 feet deep, completed in the Mt. Simon formation, with a capacity of 600 gallons per minute of sand free water. This Work shall be substantially completed by September 15, 2025, and shall be completed and ready for final payment on or before September 30, 2025. Construction of Municipal Well No. 9: Generally, includes constructing and developing one well, test pumping, and water analysis. The anticipated well design is 348 feet deep, completed in the Jordan formation, and capacity of 1,500 gallons per minute of sand free water. This Work shall be substantially completed by September 15, 2025, and shall be completed and ready for final payment on or before September 30, 2025. Alternative No. 1 - Screened Well: Well driller shall provide a recommendation regarding whether or not Wells No. 9 (Jordan Well) should be a screened well. This is dependent on actual geology encountered and whether an open hole is recommended. A stainless steel well screen, filter pack, and removeable "J" hook type Johnson Packer shall be included if a screened well is recommended. This Work shall be substantially completed by September 15, 2025, and shall be completed and ready for final payment on or before September 30, 2025. Optional Alternative No. 2A - Final Completion May 31, 2025 See "Construction of Municipal Well No. 8" and "Construction of Municipal Well No. 9" above. The Work shall be substantially completed by May 15, 2025, and shall be completed and ready for final payment on or before May 31, 2025. Optional Alternative No. 2B - Screened Well - Final Completion May 31, 2025 See "Alternative No. 1 - Screened Well" description above. This Work shall be substantially completed by May 15, 2025, and shall be completed and ready for final payment on or before May 31, 2025. Optional Alternative No. 3A - Final Completion September 30, 2024 See "Construction of Municipal Well No. 8" and "Construction of Municipal Well No. 9" above. The Work shall be substantially completed by September 15, 2024, and shall be completed and ready for final payment on or before September 30, 2024. Optional Alternative No. 3B - Screened Well - Final Completion September 30, 2024 See "Alternative No. 1 - Screened Well" description above. This Work shall be substantially completed by September 15, 2024, and shall be completed and ready for final payment on or before September 30, 2024. All Bidders must certify they are a Responsible Contractor by signing a certification form stating they meet the minimum requirements under Minnesota Statute 16C.285. This form can be found in Section 00 43 29 of the project documents. Each Bid shall be accompanied by a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of Minnesota, payable to the City of Minnetrista, in a sum equal to five (5) percent of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter into a Contract within 15 days of Notice of Award in accordance with the terms of the principal's Bond and a contractor's Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. Bidder must be licensed for the full amount of the Bid. No Bid will be read or considered which does not fully comply with the above provisions as to bond and license. All Bids will be made on the basis of cash payment for such Work. The Owner reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the Owner. The Owner reserves the right to hold the three (3) lowest Bids for a period not to exceed forty-five (45) days after the date of Bid opening. Each set of Bidding Documents will include the Project Manuals and one (1) complete set of 11x17 inch Drawings. All costs associated with preparation of Bids shall be borne by the Bidder. All costs for either digital or paper copies are NON-REFUNDABLE. Bid Results Optional Alternative No. 2A TRAUT COMPANIES $1,659,188.00 Optional Alternative No. 2B TRAUT COMPANIES $38,840.00
Bid Results
Water / Sewer
$1,698,028.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2024
June 7, 2024
Multiple Locations, Minnetrista, MN
Related To This Project
Minnetrista, MN
Bid Date: Jul 09 2024
Minnetrista, MN
Bid Date: Apr 28 2021
Minnetrista, MN
Bid Date: Nov 12 2024
Minnetrista, MN
Bid Date: May 05 2021
Minnetrista, MN
Bid Date: Mar 07 2019
Minnetrista, MN
Bid Date: Mar 14 2019
Minnetrista, MN
Bid Date: Feb 21 2024
Minnetrista, MN
Bid Date: Jan 19 2022
Minnetrista, MN
Bid Date: Jan 19 2022
Minnetrista, MN
Bid Date: Jul 11 2023
Minnetrista, MN
Bid Date: Jul 13 2023
Minnetrista, MN
Bid Date: Mar 18 2022
Minnetrista, MN
Bid Date: Jun 01 2023
Minnetrista, MN
Bid Date: Apr 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.