BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a municipal facility in Florence, South Carolina. Completed plans call for the renovation of a municipal facility.

Project Location: DDSN Pee Dee 714 E. National Cemetery Rd. Florence, SC 29506 Construction Cost Range: 12,000.00 - 30,000.00 Description: Remove and dispose of three existing HVAC / Heat Pump units and install three new 5-Ton HVAC / Heat Pump units. Scope of work: A. Remove and dispose of three existing HVAC / Heat Pump units. B. Install three new 5-Ton HVAC / Heat Pump units. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. G eneral Scope: A. Furnish all labor, materials, tools, and equipment necessary to remove existing HVAC Units and install new HVAC units and related items indicated on the drawings and/or specified herein. B. Contractors will provide all labor and materials meeting state laws and regulations. C. The contractor will be responsible for removal and disposal of the existing air-conditioners. D. The contractor will be responsible to have all units running efficiently at final walk-through. E. They will repair any damage done to State property during the project. Acceptable Manufacturers: A. Acceptable manufacturers are Trane, Carrier, Payne, ICP, Lennox, York, Heil, Rheem Rudd, and Goodman. Installation: A. All replacement units must be set up to use R410-A refrigerant. B. The efficiency standards for heat pump systems will be 14.3 SEER2 which is equivalent to 15.0 SEER and 7.5 HSPF2, or 8.8 HSPF. C. When installing copper refrigerant tubing, a dry nitrogen purge must be used to prevent oxidation inside the pipe. D. When installation of the unit is complete, a vacuum must be pulled on the refrigerant system to remove moisture and contaminants, and the system must be leak tested. E. The existing thermostats will be connected to energy management system. F. A local power disconnect must be installed at the package unit. G. Reuse existing pad. H. Provide a design and specifications to show any necessary roof alterations to be completed to accommodate the new rooftop equipment to be installed as needed.

Award

Municipal

$25,525.00

Public - State/Provincial

Renovation

4

3

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
72
Bidding Soon
732
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 10, 2024

img_map_placeholder

714 E National Cemetery Rd, Florence, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.