Published July 29, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work and new construction of a water / sewer project in Polk, Pennsylvania. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Estimated budget: General - $10,105,000 HVAC - $385,000 Plumbing - $410,000 Electrical - $2,135,000 The Project includes the following Work: Construction of a new 450,000 gpd wastewater treatment facility to replace the existing plant. The new plant will be constructed adjacent to the existing plant at 226 Pine School Road, Polk, PA 16342. Existing buildings and treatment facilities will be demolished following completion of the new plant. Bids are requested for the following Contracts: Contract 2024-1: General/Mechanical Work, Contract 2024-2: HVAC Work, Contract 2024-3: Plumbing Work & Contract 2024-4: Electrical Work. A certified check or bank draft, payable to the order of the Owner or negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond on the form provided, executed by the Bidder and an acceptable surety (Surety companies must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania), in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements set forth in the plans, specifications or any applicable statutes of the Commonwealth of Pennsylvania, or any applicable municipal ordinances. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price on the forms provided, with a surety company listed on the Treasury Department's most current list (Circular 570 as amended) and authorized to transact business in the State of Pennsylvania. This project will be funded through PENNVEST. Pennsylvania Prevailing wage rates will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates, labor standards, nondiscrimination in hiring practices and related matters. Frenchcreek Township reserves the right to reject any or all bids or to waive any informalities in the bidding. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Bid Result - GENERAL/MECHANICAL - Mike Coates Construction - $11,094,109.00 HVAC - Wm. T. Spaeder - $570,000.00

Bid Results

Water / Sewer

$11,664,109.00

Public - City

Demolition, New Construction, Site Work

185

42

2

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Slotted Channel Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Roof Panels, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Gaskets, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Sectional Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Musical Equipment, Bells, Healthcare Equipment, Examination and Treatment Equipment, Treatment Equipment, Other Equipment, Horticultural Equipment, Seeders
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Floor Mats, Furniture, Seating, Chairs, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Static Uninterruptible Power Supply, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
105
Bidding Soon
929
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 23, 2024

img_map_placeholder

226 Pine School Rd, Polk, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Waste Water Treatment Plant Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.