BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sangudo, Alberta. Conceptual plans call for site work for a water / sewer project.

The existing North 43 Lagoon facility was constructed in 2003 and has the following infrastructure: Sixty (60) day facultative lagoon cell with 12,600 m3 of storage and HDPE geosynthetic liner, Twelve (12) month storage cell with 76,300 m3 of storage and HDPE geosynthetic liner, Designed service population of one thousand five hundred (1,500) people, including seasonal and permanent residences, A sewage pump station to transfer sewage from the facultative cell to the storage cell, A two hundred (200) mm diameter forcemain with pump station to discharge the treated effluent from the storage cell to No Outlet Lake, and Designed daily waste flow capacity of two hundred and nine (209) m3/day or (76,300 m3/year). The North 43 Sewage Lagoon discharges annually in October to No Outlet Lake, a wetland area located approximately three (3) km to the north of the lagoon. The lagoon discharges through a forcemain at the rate of forty-two (42) L/s over the allowable discharge period of twenty-one (21) days. An expansion to this facility is required to accommodate the future wastewater volumes as outlined in the Feasibility Study or Studies. An expansion may also require anaerobic, facultative and storage cells, or utilization of the existing cells and construction of a new cell(s). TIMELINE: Request for Proposals from engineering consultants for preliminary planning and design services is currently underway. Scope of work, construction cost, and timelines for tender and construction to be determined. Further update pending award of contract. *Budget is undefined.

Conceptual

Water / Sewer

$2,000,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
45
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

img_map_placeholder

AB-43, Sangudo, AB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.