BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in Lead, South Dakota. Completed plans call for the remodel of a municipal facility.

The Long-Baseline Neutrino Facility (LBNF) Project will provide facilities to enable a world-class program in neutrino physics that can measure fundamental physical parameters, explore physics beyond the Standard Model and better elucidate the nature of matter and anti-matter. Specifically, LBNF will build a new high-intensity neutrino beam at the Fermi National Accelerator Laboratory (Fermilab), the "Near Site," aimed at the Sanford Underground Research Facility (SURF), 1,300 km away at the "Far Site," where a neutrino detector will be built; also known as DUNE (Deep Underground Neutrino Experiment). The experiment will be optimized for precision measurement of neutrino oscillations with the goal of searching for charge parity-violation in the neutrino sector, as well as making other precision oscillation measurements. SURF is owned and operated by the South Dakota Science and Technology Authority (SDSTA). The LBNF Project will require office space in the Ross Dry for Fermi Research Alliance (FRA) staff for the LBNF project as defined in the attached Request for Proposals (RFP). The proposed office space will be constructed via a design-build contract. The office remodeling will require modifying approximately 2600 square-feet of area within the existing Ross Dry building. Provide necessary design drawings prepared and stamped by a South Dakota registered professional engineer to gain permits required for the scope of work within the existing Ross Dry building. Subcontractor to provide all necessary tools, equipment, and materials, labor and supervision to perform the office remodeling. The office remodeling will require modifying approximately 2600 square-feet of area within the existing Ross Dry building. Provide necessary design drawings prepared and stamped by a South Dakota registered professional engineer to gain permits required for the scope of work for FRA within the existing Ross Dry building. Supply the appropriately skilled personnel to perform the following types of listed activities: - Stamped drawings as required by local codes - Demolition and removal of debris - Electrical upgrades and circuit retrofitting - HVAC system installation and upgrades - Self leveling floor prep. and application - Plumbing as needed - Interior door and hardware installation - Carpet tile substrate prep. and installation - Window retrofitting - Drywall installation and finishing - Painting, staining, and finishing - Data pathways provided, network infrastructure by others Subcontractor shall provide design-build services including cost-saving alternatives. Alternate products proposed must be supported by recognized industry standard documents and/or data. Subcontractor shall provide design-build services to provide the office buildout at the agreed-upon schedule of values presented in the Subcontract. Required subcontractors (second tier) to the design-build Subcontractor must be listed and approved by FRA as a part of the response to this Scope of Work. In addition to providing personnel, Subcontractor shall provide expendable equipment and material required to perform the office buildout activities.

Post-Bid

Municipal

$250,000.00

Public - Federal

Remodeling

68

21

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
61
All Active Projects
24
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 3, 2024

img_map_placeholder

100 Ross Rd, Lead, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.