Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Lead, South Dakota. Completed plans call for site work for a water / sewer project.
The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components: Demolition of the existing concrete reservoir, site grading, and construction of a bolted steel reservoir, and associated work as shown on the plans. BIDDING REQUIREMENTS: Bids shall be submitted on the Bid Forms provided and in accordance with the Bidding Documents. No bids will be considered unless sealed and filed at Terry Valley - Trojan Water District - Main office, Lead, SD. Each Bid shall be accompanied by a certified check, cashier's check or a bank draft drawn on a State or National Bank for five percent (5%) of the amount bid payable to Terry Valley - Trojan Water District or in lieu thereof a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of South Dakota, payable to the Terry Valley - Trojan Water District, in a sum equal to ten percent (10%) of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter into a Contract within 15 days of Notice of Award in accordance with the terms of the principal's Bond and a contractor's Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. The checks of unsuccessful bidders will be returned within thirty (30) days after the bids have been opened. Only Bids that are accompanied by such a Bond will be considered. Bidders on this Work will be required to comply with the President's Executive Order Nos. 11246 (Equal Employment) as amended. Bidders shall also comply with Executive Orders 11625, 11518, 12138, and 12432; 40 CFR part 33; Section 129 of P.L. 100-590 Small Business Reauthorization & Amendment Act of 1988; Public Law 102-389 (42 U.S.C. 437d); a 1993 appropriations act ("EPA's 8% statute"); Public Law101-549, Title X of the Clean Air Acts Amendments of 1990 (42 U.S.C. 7601 note) ("EPA's 10% statute"). The requirements for Bidders and Contractors under these orders are explained in the specifications. Bidders are advised that the Workforce Participation Goals are 7.9% for Minority and 6.9% for female participation in each trade. The fair share objective of this project is 1% MBE's and 4% WBE's. A directory of Certified M/WBE firms can be found at this website at online or by contacting the DBE Program Coordinator at 605-773-4906. Bidders on this Work will be required to comply with Public Law 115-232 Prohibition of Certain Communication Technologies. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. The low responsive bidder will be required to certify compliance with the American Iron and Steel provision of the Consolidated Appropriation Act of 2014. This Certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposals. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. All Bidders shall have a valid South Dakota Contractor's license of the appropriate Class for the work, as required by ARSD 20:53:06 or SDCL 36-25. Bidders shall enclose a copy of their license or Certificate of Renewal in the same envelope as the Bidders Bond. Bidder must be licensed for the full amount of the Bid. No Bid will be read or considered which does not fully comply with the above provisions as to bond and license. Any deficient Bid submitted will be returned to the Bidder unopened. The Contractor shall be able to demonstrate that they have successfully completed municipal utility work of a similar nature and scope as that required for the project. OWNER'S RIGHTS RESERVED: All Bids will be made on the basis unit price as indicated in the Bid Form. The Owner reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the Owner. No Bidder may withdraw their bid for a period of thirty (30) days after the date of Bid opening. The Work shall be substantially completed by June 30, 2026 and shall be completed and ready for final payment on or before July 28, 2026. Construction work may occur between April 1st and July 28th. The new bolted steel storage tank must be operational within the same year that construction begins. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. and 5:00 p.m. local time and may obtain copies of the Bidding Documents from the Issuing Office. A $50.00 non-refundable fee is required for plans and specifications for requests outside the state of South Dakota.
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2024
April 1, 2026
To Be Determined, Lead, SD
Related To This Project
Lead, SD
Bid Date: Nov 04 2024
Lead, SD
Bid Date: Oct 21 2024
Lead, SD
Bid Date: Aug 15 2024
Lead, SD
Bid Date: Aug 15 2024
Lead, SD
--
Lead, SD
Bid Date: May 16 2024
Lead, SD
Bid Date: May 17 2024
Lead, SD
Bid Date: May 06 2024
Lead, SD
Bid Date: May 06 2024
Lead, SD
Bid Date: May 03 2024
Lead, SD
Bid Date: Apr 11 2024
Lead, SD
Bid Date: Mar 03 2021
Lead, SD
Bid Date: Feb 13 2024
Lead, SD
Bid Date: Jan 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.