BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in East Weymouth, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Removal of existing wood trim, railings and decking at selective entry porches and replacement with new PVC components. Demolition and replacement of (4) ADA ramps. Selective removal and replacement of existing asphalt walkways. All Sub-bidder questions must be received by 5/2/24 @ 10:00 A.M. in order to be answered by addendum. All General Bidder questions must be received by 5/16/24 @ 10:00 A.M. in order to be answered by addendum. Quotes are subject to M.G.L. c. 149 44A(2)(B) and to state prevailing wage rates as required by M.G.L. c. 149 26 through 27H inclusive. DESCRIPTION OF WORK A. The scope of work under this Section includes the furnishing of all labor, materials, equipment and appurtenances; and performing all operations required for clearing and grubbing the site. Work will include, but not be limited to: 1. Stripping of existing surficial vegetation and organic soils. 2. Removal of all surficial vegetation including trees, brush, dead wood, and other surficial vegetation. 3. Removal of roots and stumps to a minimum depth of 24 inches below the ground surface or diameters of less than 3 inches, whichever comes first. 4. Removal of existing structures, concrete and asphalt. B. Provide adequate pumping and drainage to keep all excavations and work sufficiently dry from groundwater and/or surface runoff so as not to adversely affect construction product nor cause excessive disturbance of underlying ground. Water shall be disposed in such a manner as will not cause injury to public health, or damage to public or private property, existing work or work in progress. The Contractor shall comply with all applicable environmental protection and/or sediment/erosion/dust control regulations. C. The Contractor shall take all necessary measures to minimize dust from rising and blowing across the site. The Contractor shall control all dust created by construction operations and movement of construction vehicles, both on site and on paved ways.

Post-Bid

Sidewalks / Parking Lot

$700,797.00

Public - City

Paving, Site Work

60

15

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
162
Bidding Soon
2,547
All Active Projects
1,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 10, 2024

img_map_placeholder

304 Lake St, East Weymouth, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.