Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

New construction of a bridge / tunnel in Sault Ste. Marie, Ontario. Completed plans call for the construction of a bridge / tunnel.

Bridge Shop Drawings: The Lump Sum bid for this item shall include all engineering, labor, equipment and material necessary to provide Shop Drawings for the proposed bridge structure. Shop Drawings and Calculations shall be stamped by a Professional Engineer licensed in the Province of Ontario and submitted electronically to the Owner for review. Payment for this item will be due upon receipt of the shop drawings. Bridge Design Criteria: Overall Length: 40 metres (out to out dimension) Width: 2.5 metres (clear between rails) Camber: 750mm Handrail & Guards: Per OBC Design Code: OBC Design Loading: 4.8 kPa Live Load, Wind & Snow Load per OBC, Small Utility Vehicle + Operator Weight of 1050 kg (John Deere Gator XUV) Material: Weathering Steel or Aluminum Material Preparation: SSPC - SP1 Wearing surface: Treated Cedar, Treated Hemlock or Composite Max Weight: 60,000 lbs Design Life: 75 years minimum Anchor bolts and bolt holes shall be designed to accommodate expansion and contraction. Abutments (by others): Bolt-a-Bin structures with concrete pads. Questions related to this bid are to be submitted to david.spacek@wsp.com prior to April 5th, 2024.

Occupancy

Bridges / Tunnels

$350,000.00

Public - City

New Construction

6

6

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

May 6, 2024

Project location map

Fourth Line E, Sault Ste. Marie, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed