BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Beech Island, South Carolina. Completed plans call for site work for a water / sewer project.

Work to be done: The work to be done consists of furnishing all materials, equipment and labor for the construction of: Installation of approximately 6,614 linear feet of 12-inch water line to replace the existing water line. Project includes the installation of valves hydrants and all appurtenances and the abandonment of the existing water lines. Time allotted for this work is 270 consecutive calendar days. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. The project is proposed to be funded with a State Revolving Fund loan. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. All Bidders must have a State of South Carolina Contractors WL4 or higher License. All SRF, Davis Bacon Wage Determination, and American Iron and Steel Special Conditions, requirements apply. All proposals shall be accompanied by a Bid Bond drawn in favor of Beech Island Rural Community Water and Sewer District, in the amount of at least five percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for Beech Island Rural Community Water and Sewer District. Each bond shall be equal to one hundred percent (100%) of the contract amount. The Bid Bond shall be forfeited to Beech Island Rural Community Water and Sewer District as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract.

Bid Results

Water / Sewer

$1,908,355.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
37
Bidding Soon
493
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

July 29, 2024

img_map_placeholder

Beech Island Ave, Beech Island, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.