Site work and paving for a sidewalk / parking lot in Goldsboro, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Deadline for Written Questions: April 29, 2024 Questions may be faxed to Mandy Trujillo at fax # (919) 731-1388 or emailed to: amanda.trujillo@waynegov.com. The County of Wayne reserves the right to reject any and/or all proposals. The County of Wayne encourages all businesses, including minority, women owned businesses to respond to all Request for Proposals. Scope of Services will include, furnish all labor, materials. Insurance, and equipment necessary to do the following work on the above project. o The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. o The contractor shall confirm all given information and advise the building owner, prior to bid, of any conflicts that will affect their cost proposal. Extent of Work 1. Contractor is responsible to verify all measurements. Parking lot area to be resurfaced is approximately 47,272 sq. ft. 2. Mill off existing asphalt to a depth of 2.00 with milling machine and dispose of debris offsite. Provide a smooth transition with the adjoining asphalt drives and concrete curbing and sidewalks. 3. Base: a. Add additional aggregate to fill in any voids in the base. b. Grade base course evenly and compact to 100% c. Maintain a uniform surface on the base course until placement of asphalt surface is complete. 4. Asphalt Surfacing: a. Install two (2) inches of asphalt (recycled content may be used) 5. Marking: a. Contactor shall submit a layout for approval b. Include all standard parking stalls, ADA HC parking, and any other required markings per industry standards and codes. c. After laying out the lines, paint shall be applied with Kelly-Creswell Model C, airless striping machine or equivalent. d. Lines shall be straight and four (4) inches in width e. Paint shall meet Federal Specification TTP-1952B 6. Schedule: a. The facility will be shut down during the work so it is accentual that the project be completed in a timely manner. A timeline shall be set and coordinated between County staff and the contractor. c. Liquidated damages shall apply if the work is not fully completed within the agreed upon time. 7. Permits: All permits necessary for the prosecution of the work shall be secured by the Contractor. The Contractor shall give all notices and comply with all laws, ordinances and regulations bearing on the conduct of the work. 8. Material and Supplies: Unless specifically provided otherwise in each case, all material and supplies shall be furnished by the Contractor for permanent installation. The work shall conform to applicable standard specifications. No such material or supplies shall be used by the Contractor for any purpose other than that intended or specified, unless such use is specifically authorized by the County in each use. 9. Staging Area: The staging area and all areas for material storage will be limited on site as designated by the County prior to the start of construction. Contractor is responsible for repair to existing pavement caused by construction operations. 10.Temporary Security and Protection: Provide temporary protection for adjacent areas to prevent contamination by construction operations such as dust, debris, fumes, etc. Provide temporary barricades as necessary to ensure protection of the public and County employees. 11.Site: All areas of work shall be cleaned up and any material and equipment will need to be out of the way after work is completed for the day. Contractor shall take care not to damage any concrete, landscaping, etc. Any damage caused by the contractor shall be repaired prior to the completion of the project. Contractor shall also be responsible for all damages that may arise from installing the new paint such as but limited to: overspray, dropped paint on non-painted surfaces, etc. 12.Warranty: Contractor shall provide a minimum one-year warranty for all material and workmanship.

Bid Results

Sidewalks / Parking Lot

$208,500.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
61
Bidding Soon
1,091
All Active Projects
448
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

June 5, 2024

img_map_placeholder

2001 E Ash St, Goldsboro, NC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.