BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a bridge / tunnel in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel.

BRIDGE STEEL GIRDER REPAIRS AND OTHER WORK HIGHWAY 2:15 B.F 78895-1 CPKC and CNR Overpass on Deerfoot Trail kilometre 28.010 to 28.265 (NBL) HIGHWAY 2:15 B.F 78895-2 CPKC and CNR Overpass on Deerfoot Trail kilometre 28.140 to 28.390 (SBL) SOUTHERN REGION APPROXIMATE QUANTITIES: 16 Day Misc. Occupancy - Lane Rental - CPKC Track Block 34 Day Lane Closure for Bridge Construction - Hwy 2 Single SBL 34 Day Lane Closure for Bridge Construction - Hwy 2 Single NBL 1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 78895) 1 Lump Sum Temporary Access Equipment and Structures 1 Lump Sum Confined Space Management 204 Location SB Bridge - D1 - Stiffener to Bottom Flange 198 Location NB Bridge - D1 - Stiffener to Bottom Flange 48 Location SB Bridge - D2 - Stiffener to Top Flange 48 Location NB Bridge - D2 - Stiffener to Top Flange Contractor to supply all materials.

Award

Bridges / Tunnels

$6,337,000.00

Public - State/Provincial

Site Work

45

15

6

5

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

May 1, 2026

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.