BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Renovation of a laboratory facility in Bourne, Massachusetts. Completed plans call for the renovation of a laboratory facility.

*As of February 28, 2025, project construction is currently underway, and estimated completion date is October 2026. Request for Qualifications for TRADE CONTRACTORS - For the Following Trade: - Early Electrical This project includes for a new building with updated labs, support spaces and offices that will be relocated from other campus buildings, demolition of the existing sheds where the new building is proposed to be built, and renovation and repurposing of existing labs. at Massachusetts Maritime Academy at Buzzards Bay, Massachusetts. Bonding Capacity: Interested Trade Contractors must provide a commitment letter (from a surety company licensed to do business in the Commonwealth of Massachusetts and whose name appears on the United States Treasury Department Circular 570) for payment and performance bonds in an amount equal to or greater than one hundred and ten percent (110%) of the estimated trade contract value for the subtrade that the Trade Contractor is seeking prequalification as set forth in Section I. The required commitment letter must be dated within the time frame of the RFQ procurement. Estimated Total Overall Project Construction Cost (does not include CM Fee/General Conditions): $46,000,000. Estimated Total Project Duration: 852 calendar days. DCAMM reserves the right to cancel this procurement at any time if it is in its best interest to do so.

Under Construction

Laboratories

$265,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
162
Bidding Soon
3,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

October 7, 2024

Project location map

To Be Determined, Bourne, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.