BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Irvine, California. Completed plans call for the renovation of a educational facility.

Med Surge 1 and 2 HVAC Repairs Contact Person - Abel Saldana A supplemental and optional Site Walk is scheduled for Monday, June 10, 2024 at 2:00 PM. The following General Building B Contractors have been prequalified to submit sealed bids on this project: Emcor Services Mesa Energy Systems, Inc., Irvine, CA 92618 (949) 460-0460 Los Angeles Air Conditioning, Inc., La Verne, CA 91750 (909) 596-7077 PPC Air Conditioning, Inc., Cypress, CA 90630 (714) 952-2001 Complete this form by providing (a) all information required above, (b) the amount and justification based upon the Contract Schedule for any proposed adjustment of Contract Time, (c) the proposed adjustment of Contract Sum, (d) the attached Cost Proposal Summary, (e) the attached form titled, Supporting Documentation for the Cost Proposal Summary, (f) the attached form titled Cost Breakdown for Supporting Documentation, and (g) the attached form titled Labor Breakdown for Supporting Documentation Items (f) and (g) listed above are optional and shall be completed as instructed. 2. Attach the forms titled Supporting Documentation for the Cost Proposal Summary, Cost Breakdown for Supporting Documentation, and Labor Breakdown for Supporting Documentation, for Contractor and each Subcontractor involved in the Extra Work. Each such form shall be completed and signed by Contractor or Subcontractor actually performing the Work activity identified on the form. Attach supporting data to each such form to substantiate the individually listed costs. The costs provided on these forms shall be used to substantiate Additional Costs shown on the Cost Proposal Summary. 3. The Contractor Fee shall be computed on the Cost of Extra Work of Contractor and each Subcontractor involved in the Extra Work; and shall constitute full compensation for all costs and expenses related to the subject change and not listed in the Supporting Documentation for the Cost Proposal Summary, including overhead and profit.

Award

Educational

$821,994.00

Public - State/Provincial

Renovation

14

17

5

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
561
Active Projects
262
Bidding Soon
4,099
All Active Projects
1,884
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 9, 2024

July 24, 2024

October 22, 2024

img_map_placeholder

5201 California Ave, Irvine, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.