BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Lockport, Illinois. Completed plans call for the renovation of a water / sewer project.

The site of the proposed construction is at Various locations at Lockport (Will County) and the Counties of Cook and Lake in the State of Illinois. The estimated cost of the work under Contract 20-861-2E is between $1,710,000.00 and $2,070,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Tenders are invited for the work consisting of furnishing all materials, labor, and equipment required to: The work at the Calumet Service Area (CSA) Remove existing telemetry modems, associated phone lines and telemetry line data controllers at the Primary Reporting Site located at the Calumet Water Reclamation Plant (CWRP) Central Control Facility and at each of the CSA Remote Sites. The work at the Stickney Service Area (SSA) Remove existing telemetry modems, associated phone lines and telemetry line data controllers at the Primary Reporting Site located in Stickney Water Reclamation Plant (SWRP) Process Control Building (PCB) and at each of the Remote Sites. The work at the North Service Area (NSA) 1, The work at O'Brien Water Reclamation Plant (OWRP) is as follows: a. Remove existing telemetry modems, associated phone lines and telemetry line data controllers at the Primary Reporting Site located in O'Brien Water Reclamation Plant (OWRP) Process Control Building (PCB) and each of the OSA Remote Sites. 2. The work at Egan Water Reclamation Plant (EWRP) is as follows: a. Remove existing telemetry modems, associated phone lines, and telemetry line data controllers at the EWRP Computer Room and each of the ESA Remote Sites. 3. The work at Hanover Park Water Reclamation Plant (HPWRP) is as follows: a. Remove existing telemetry modems, associated phone lines, and telemetry line data controllers at the HPWRP Utility Room, located in the basement, and each of the HSA Remote Sites. The work at the Main Office Building (MOB) Waterways Control Room (WWCR) is as follows: 1. Remove existing telemetry modems, associated phone lines, and telemetry line data controllers at the MOB WWCR and Remote Sites. The work under this Contract is classified as "Electrical". The associated goals are 13% Minorityowned Business Enterprises (MBE), 7% Women-owned Business Enterprises (WBE), and 3% VBE Veteran Business Enterprises. The purpose of the Voluntary Technical Pre-Bid meeting is to review the scope of work, to provide for identification and discussion of potential problems that might arise during the administration of this Contract and seek clarification of technical or procedural aspects of this Contract. There will be a Q&A session at the end of the meeting. Also, suppliers must give their contact information to register prior to entering the Zoom Pre-Bid meeting. Bidders are STRONGLY URGED to inspect all areas of the work sites, prior to bidding, to familiarize themselves with the nature of the work and the method of accomplishing the same. . Attendees are advised to bring a hard hat and appropriate footwear for an industrial type of facility and a current business card. Attendees will also require to furnish the "Site Visit Release and Indemnity Agreement", properly executed, which is included in Volume 1 of the bid documents package. Bidders are encouraged to give themselves enough time to clear security. Bidders are reminded that no questions will be taken during any site inspections. Each proposal must be accompanied by a bid deposit in the form of a bid bond in the amount of ONE HUNDRED THREE THOUSAND FIVE HUNDRED DOLLARS ($103,500.00). The District will only respond to questions received online UP TO ONE WEEK prior to the bid opening date of the bidding documents. The District will not respond to questions received after this date. The Project Manager for this Contract is Mr. Neel Patel. This Project Manager will provide online responses to online inquiries. The Contact person for site visits is Ms. Krystel Krol at KrolK@mwrd.org (Preferred) / (708) 588-4272 (Office) / (708) 427-9105 (Office Cell)

Post-Bid

Water / Sewer

$2,070,000.00

Public - County

Renovation

94

19

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
85
Bidding Soon
1,689
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 14, 2024

img_map_placeholder

Multiple Locations, Lockport, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.