BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Webbers Falls, Oklahoma. Completed plans call for the renovation of a residential development.

The Housing Authority of the Cherokee Nation is seeking bids from qualified contractors for the demolition and turnkey construction of One (1) Two Bedroom/ One Bathroom Replacement home located in Muskogee County. The home has tested positive for ACM. Please adhere to safe work practices for the areas noted in the attached ACM Report. Interested parties are to provide bids to furnish all necessary labor, quality control, licenses, material, equipment, tools, supplies, permits, insurance and supervision to complete the entire project and to perform the work required thereof within the time specified after receipt of "Notice to Proceed". The entire project must be fully completed within 120 work days or $1,000.00 per working day will be charged to the contractor for each day that work continues beyond the contract end date Contract Extensions will only be allowed under extenuating circumstances. The Scope of Work and Specifications are available in the bid packet, along with all information and all necessary form documents. Bid will be awarded to the lowest, most responsive/responsible bidder. The subsequent contract must be fully executed within (10) ten days of award or the bid will become null and void, and the next lowest most responsive/responsible bid will be considered. Contract award will be subject to the availability of funds. HACN will be required to have the family sign a Deed Restriction Agreement (DRA) before the contractor will be allowed to begin. When signature is obtained, we will issue the P.O. which will act as the Notice to Proceed for the project. HACN reserves the right to reject any and all bids. HACN reserves the right to determine if a bid meets stated requirements, and to award a contract that is in the best interest of the HACN, considering but not limited to the total cost and capability of the bidder. Bidders are responsible for all cost associated with the preparation and submission of bids. No bidder may withdraw their bid within 30 days after closing date.

Award

Residential Subdivision

$195,000.00

Public - Federal

Renovation

13

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
43
Bidding Soon
707
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 3, 2024

img_map_placeholder

18071 S 85th St E, Webbers Falls, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.