Site work for a water / sewer project in Greenfield, Wisconsin. Completed plans call for site work for a water / sewer project.

Removal and Replacement of pipe The project contemplated consists of the following Quantities: Propeties Participating: 24 Properties with Lateral Rehabilitation via Pipe Bursting or Open Cut: 18 Properties with Foundation Drain Disconnection: 18 Shared Connection Removals: 2 Properties with Lateral Rehabilitation of Property with a failed CIPP Liner (Category B Property): 3 The Contractor shall be responsible for: 1. The scheduling and occurrence of a preconstruction meeting with a District's representative and the homeowner to confirm the lateral replacement approach and assessment of existing conditions. 2. The scheduling of construction work with each homeowner at least two weeks prior to construction occurring. 3. The sanitary sewer lateral replacement from the mainline to a District-approved location. This may include tree, fence, and pavement removal to facilitate construction. The mainline wye connection is to be replaced with a new wye, including mainline connections. If a shared lateral connection is found, the shared connection will be removed, and two lateral wyes will be installed. This rehabilitation shall be using open cut or pipe bursting as determined at the preconstruction meeting. Post construction televising of the lateral shall be recorded and uploaded to t4Vault. 4. The sanitary sewer lateral replacement from the mainline to a District approved location for properties identified as Category B are defined separately due to the laterals being a repair due to failed lateral. The mainline wye connection is to be replaced with a new wye, including mainline connections. If a shared lateral connection is found, the shared connection will be removed, and two lateral wyes will be installed. This rehabilitation shall be using open cut or pipe bursting as determined at the preconstruction meeting. Pipe samples may be taken by the District from these failed liners. Post construction televising of the lateral shall be recorded and uploaded to t4Vault. 5. The Foundation drain disconnection of all identified properties with the abandonment of a Palmer Valve and installation of a sump pump. This process will also include electrical outlet installation to power the sump pump and installation of a District supplied runtime meter. 6. Any traffic control, permitting, and waste disposal requirements. 7. Restoration of all turf & pavement areas, including fence replacement, post construction. All questions related to this proposed contract, pre-bid presentation, or interested bidders list must be directed in writing to Nathan Churchill, nchurchill@mmsd.com, no later than 3 calendar days before the bid opening date. Questions received after this deadline or directed to other contacts at the District will not be recognized. Liquidated Damages: $1,000 per day if work is not completed within time Question Deadline 05/06/2024 at 10:00 AM CT

Bid Results

Water / Sewer

$1,044,440.00

Public - County

Site Work

17

20

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
91
Bidding Soon
1,521
All Active Projects
619
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

June 7, 2024

img_map_placeholder

Multiple Locations, Greenfield, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.