BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a municipal facility in Eastvale, California. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

**As of July 23, 2024, This project has been awarded to Bridgerock Construction, Inc., with the awarded amount of $200,872.25.** The City of Eastvale is soliciting bids for the construction of a tenant improvement for City Hall Expansion. The project scope includes, but not limited to, demo, framing, grid, utilities, door installation, hardware, electrical, fire sprinklers, plumbing, flooring, cabinets, HVAC, paint and project management. See project specifications for project details and requirements. Any subsequent changes in the project from the date of issuance to the date of submittal will result in an addendum by the issuing office to those on the Planholders list. Online Q&A Yes Q&A Deadline 04/23/2024 12:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 25 working days Liquidated Damages $1,000/day SCOPE OF WORK A. Contractors Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the Owner all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Modular Offices at Citrus Street Property Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter the Work or Project), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in the Exhibits attached hereto and incorporated herein by this reference. SCOPE OF WORK PHASE 1: Demo & Framing A. Demo Remove existing cabinets Demo and remove walls B. Framing Infill three existing wall openings a. Install 5/8” drywall one layer on each side, tape and mud to #4 level, sand and prep for paint Frame for (7)new doors Frame for new offices a. Install 5/8” drywall one layer on each side, tape and mud to #4 level, sand and prep for paint, unless noted otherwise for soundproof wall Cut and frame two new wall openings C. Grid Modify existing or provide and install 15/16” grid to finish ceiling Modify existing or provide and install ceiling tiles to match existing (Cortega #769 equivalent) PHASE 2: Electrical, Plumbing & HVAC A. Electrical Demo/safe off all existing electrical on walls to be removed and repair wall Demo/safe off all existing electrical in office room floors and repair floor Demo/safe off existing 240v power in existing X-ray rooms Re-work existing light switches at 3 locations to accommodate the new wall layout in office spaces B. Plumbing Cap water lines leading to the office floor angle stops and repair floor Remove unwanted sinks/cap off plumbing and repair wall and/or floor Cut off and cap existing utility coming out the ground in existing exam rooms and repair floor Ensure all faucets having working cold and hot water C. HVAC Relocate one existing air return

Award

Municipal

$200,872.00

Public - City

Addition, Demolition, Renovation, Site Work

13

7

9

3

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
89
Bidding Soon
2,204
All Active Projects
984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

July 3, 2024

img_map_placeholder

12363 Limonite Ave, Eastvale, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.