BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Durham, North Carolina. Completed plans call for the renovation of a municipal facility.

All inquiries, questions, requests for substitution, and/or clarifications: Must be submitted in writing via the email below according to the directions given in the Request for Approval of Substitution and in the Instructions to Bidders prior by 12:00 PM, Friday, April 26, 2024. All questions should be directed to: By emailing: Trish Creta Senior Construction Project Manager City of Durham General Services Department Phone - (919) 560-4197 trish.creta@durhamnc.gov Underutilized Business Enterprise (UBE) goals: The Underutilized Business Enterprise (UBE) goals for this project are MBE 0% and WBE 0%. Bidders are responsible for filling out the required UBE Construction forms and including them in their bid package to be considered responsive. Contract completion time for all work on this project is 100 calendar days. SCOPE OF WORK A. Project Description B. Replacement of Module 1 compressor 1. Equipment Information Make: Multistack Equipment Model #: MS080TC3H2W2AAC-R134A Serial #: AE 02 066 2. Recover refrigerant 134a from the module and dispose of per EPA regulations. 3. Furnish all required rigging to hoist compressors from stairwell to equipment room. 4. Furnish all required rigging to remove old compressor and set new compressor. 5. Disconnect refrigerant lines and electrical from old compressor and remove. 6. Furnish and install new compressor and reconnect refrigerant lines and wiring. 7. Leak test the repairs and evacuate system to 500 microns. 8. Perform a 1 hour vacuum decay test. Load 80 lbs. of new refrigerant into the system. 9. Power up new compressor and commission. 10. Startup module for proper operation and performance. C. Replacement of Module 4 compressor 1. Equipment Information Make: Multistack Equipment Model #: MS080TC3H2W2AAC-R134A Serial #: AE 02 065 2. Recover refrigerant 134a from the module and dispose of per EPA regulations. 3. Furnish all required rigging to hoist compressors from stairwell to equipment room. 4. Furnish all required rigging to remove old compressor and set new compressor. 5. Disconnect refrigerant lines and electrical from old compressor and remove. 6. Furnish and install new compressor and reconnect refrigerant lines and wiring. 7. Leak test the repairs and evacuate system to 500 microns. 8. Perform a 1-hour vacuum decay test. Load 80 lbs. of new refrigerant into the system. 9. Power up new compressor and commission. 10. Startup module for proper operation and performance. D. BPHX (brazed plate heat exchanger) Cleaning of Modules 1 through 4 1. Equipment Information Make: Multistack Equipment Model #: MS080TC3H2W2AAC-R134A Serial #: AE 02 63; AE 02 64; AE 02 65; AE 02 066 2. Condenser BPHX Scope Lockout/Tagout machine electrically. Isolate the brazed plate heat exchangers (BPHE) from the system by closing the supply and return water valves. Drain condenser piping and BPHE for each module. Unbolt the Gruvlok couplings and remove from the 90 degree bend from both the top and bottom (inlet and outlet) of each BPHE for cleaning separately. 3. BPHE Scope Install necessary fittings and adaptors on each BPHE individually to attached Multistack BPHE cleaning machine. Fill exchanger with water and scale dissolver solution (6 gallon each BPHX mfg. recommendations). Perform a hydrostatic test with cleaning pump. Circulate Multistack scale-dissolver solution for (4) hours as per factory recommendation. 4. Flushing Process Add Scale Break Neutralizer solution to lower Ph to acceptable level to flush and drain cleaning water and solution. Add fresh water to the machine reservoir and circulate through HPHE until water runs clear. Reverse cleaning machine hoses and backflush any debris that may have settled in the bottom of the BPHE. Repeat as needed. Remove all fittings and disconnect cleaning machine. Reinstall inlet and outlet header using new gaskets. Backfill HPHE's headers and piping. Open isolation valves and place machine back into service. Startup module and check for proper operation and performance.

Post-Bid

Municipal

$3,372,000.00

Public - City

Renovation

3

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
47
Bidding Soon
1,243
All Active Projects
509
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.