BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Frankfort, Kentucky. Completed plans call for site work for a municipal facility.

Sprinkler System Maint & Repairs KSP HQ As of May 7, 2024, the bid has been extended by the owner to May 15, 2024. Question Deadline 06/06/2024 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered The Contractor shall provide all of the materials and perform all the work described in the Specifications and/or shown on the Drawings. The Sprinkler System of the Kentucky State Police Headquarters will be upgraded per NFPA 13 "Standard for the Installation of Sprinkler Systems", the Kentucky Building Code with Current Revisions, Americans with Disabilities Act, International Building Code, National Fire Alarm and Signaling Code NFPA72, and National Electrical Code. All Sprinkler heads will be replaced with new sprinkler heads and plates, finish and color to be determined during shop drawing review stage. Sprinkler heads shall be rough brass finish in all exterior and wet locations. All new and/or replaced sprinkler piping including damaged during construction shall be painted. Sprinkler heads shall be white color (in light ceiling areas) in ACT or gypsum ceilings. Sprinkler heads will be rough brass finish in the attic and other dark color areas. The Dry Riser including all check valves, air compressor, alarm valve, gate valves, pressure switches, tamper switches, all riser trim, all riser gauges, including the double check detector assembly will be replaced by the Contractor. This includes replacing the fire protection vault, the DCDA, the fire department connection and post indicator valve will be per Frankfort Plant Board Specs. The system will comply with all manufacturers' requirements and shall report compatible alarm signals to the Fire Alarm Panel, which will monitor any and all sprinkler system pressure/flow switches and tamper switch operations. The Owner's preferred daily work schedule shall be Monday-Thursday 10 hour/day. There are no Contractor working days on Friday-Sunday. A 48 hour notification is required for any outage of the existing Sprinkler and Fire Alarm System. Any damaged utility by the Contractor must be put back into service immediately.

Award

Municipal

$443,700.00

Public - State/Provincial

LEED Certification, Site Work

7

9

8

9

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
127
Bidding Soon
1,716
All Active Projects
835
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 20, 2024

June 21, 2024

August 30, 2024

img_map_placeholder

919 Versailles Rd, Frankfort, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.