Renovation of an educational facility in Kearny, New Jersey. Completed plans call for the renovation of a educational facility.

The project involves selective removals, new ceilings and related carpentry, painting, electrical work related to lighting and other associated work in all instructional spaces Bidders may visit the sites by contacting Mark Bruscino, Director of Plant Operations at 201-955-5116 or by email: mbruscino@kearnyschools.com, to arrange a site visit. All questions with regard to the bid must be received by the Architect, Fallon+Pacheco Architects, no later than WEDNESDAY, JUNE 19TH, 2024. All questions must be submitted in written form. Bids shall be delivered in person to the office of the Business Administrator/Board Secretary between the hours of 8:00 A.M. and 4:00 P.M. on official business days. Bids are submitted on the proposal forms in the manner designated, enclosed in a sealed envelope bearing the name and address of bidder and proposal identification number on the outside, and must be accompanied by certified check, cashiers check or bid bond drawn to the order of the Kearny Board of Education, for not less than ten percent (10%) of the amount of the bid, but in no case in excess of twenty thousand ($20,000.00); and must be delivered to the Business Administrator at the above place, by the hour named. The Board of Education and Architects assume no responsibility for bids mismailed or misdirected. Each bidder shall submit with its bid, a Certificate of Concent of Surety as per N.J.S.A. 18A:18A-25 from a Surety company stating that it will provide the bidder and all subcontractors, if successful, with a performance/ payment bond in the full amount of the contract. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof'. The Kearny Board of Education reserves the right to reject and and all bids or to waive informally in the bidding if it is in the interest of the Board of Education to do so. The contract(s) will be awareded to the lowest responsible bidder(s). Bidding shall be in conformance with the applicable requirements of N.J.S.A. 10:5-31 et. seq. and N.J.A.C. 17:27. All bidders must be pre-qualified as required by the New Jersey Schools Development Authority (NJSDA). The Bidders' attention is directed to the fact that all applicable federal, state, and municipal laws, and ordances, rules and regulations, incuding P.L. 1975, c. 127, (N.J.A.C. 17:27) regarding Affirmative Action, of all authorities having jurisdiction over construction work in the locality of the project shall apply to the contract throughout, and they will be deemed to be included in the contract the same as if set forth therein at length, including, but not limited to, those laws indentified in the INSTRUCTIONS TO BIDDERS. Pursuant to "The Public Works Contractor Registration Act" (P.L. 1999, c238), bidders and their subcontactors are required to be registered with the New Jersey Department of Labor and to possess a current certificate by said Department indicating compliance with the Act. Bidders are notified of this requirement of their complaince. If, at the time of the bid opening stated above, the certificate or renewed certificate from the Department has not yet received by the bidder, proof of application along with the cancelled check for the application fee shall be provided to the Board of Education in lieu of such certificate. Once the certificate is received, a copy of same shall be delivered forthwith to the Kearny Board of Education. The Owner Reserves the Right to Reject Any or All Bids and Not Award a Contract for Any Portion of the Project if the Owner Has Not Obtained the Requisite Approval for the Project or Any Portion Thereof From the Appropriate State Agency. Any Agreement Entered Into by the Board for Any Portion of the Project is Expressly Conditioned Upon the Owner Obtaining the Requisite Approval for the Project or Any Portion Thereof. Work included: This Section applies to situations in which the Contractor or his representatives including, but not necessarily limited to, suppliers, subcontractors, employees, and field engineers, enter the Owners property.

Award

Educational

$2,638,000.00

Public - City

Renovation

47

17

14

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
237
Bidding Soon
5,029
All Active Projects
2,123
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

August 16, 2024

img_map_placeholder

100 Davis Ave, Kearny, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.