BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Clearwater, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Pinellas Road Name: SR 60 (Ccampbell) Limits: From Ccampbell Tr to Bayshore Tr Project(s): 43749815201(*) Federal Aid No: D723081B Project(s): 43749815202 Federal Aid No: N/A Project(s): 43749815601 Federal Aid No: N/A Total Roadway Length: 0.339 Miles Contract Days: 640 Total Bridge Length: 0.010 Miles Total Proposal Length: 0.449 Miles Contract Execution Days: 10 Day Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Description: The Improvements under this Contract consist of construction of a pedestrian/bicycle overpass including a shared use path, milling and resurfacing, drainage, sidewalk, guardrail, signing and pavement marking, lighting, and utility work by highway contractor, on SR 60 (Gulf to Bay Boulevard) east of Bayshore Boulevard, in Clearwater, Pinellas County. Question Deadline 05/15/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 022: Bridge Construction (Pedestrian - Bicycle Overpass) / Drainage Improvements - SR 60

Award

Roads / Highways

$15,294,810.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

129

19

9

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
48
Bidding Soon
893
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

July 22, 2024

img_map_placeholder

State Rd 60, Clearwater, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.