BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Halfway, Oregon. Contact the soliciting agency for additional information.

THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME. Work includes, but is not limited to: asphalt patching of USFS Route 39 (Wallowa Mountain Loop Road) from the Forest boundary to Mile Post 26. Asphalt repairs will consist of removing all loose damaged asphalt, cleaning area, applying tack coat and placing and compacting of hot mix asphalt skin patch. Damaged areas consist of potholes, spalled areas, depressions, and raveled or damaged pavement edges in roadway surfaces. Individual patch sizes vary, but generally will be 8' - 12' wide, 25' - 200' in length, and 1.5" - 3" depth. Estimated start work date is 24 June 2024 and all work shall be complete by 1 September 2024. Magnitude of construction is between $100,000 and $250,000. This notice is for the issuance of a blanket purchase agreement call request on BPA Region 6 Road and Bridge Construction 1240BH23Q0001. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Roads / Highways

$250,000.00

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
39
All Active Projects
16
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

img_map_placeholder

Wallowa Mountain Loop, Halfway, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.