BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Lewiston, Maine. Contact the soliciting agency for additional information.

The proposed responsibilities of the MEP Commissioner are listed below. A finalized list of these responsibilities will be incorporated into the agreement executed between the City of Lewiston and the selected respondent. The mechanical systems will be provided, installed, and programmed to function in a way that supports operations of this facility. The facility will incorporate a control system that will maximize energy efficiency and comfort. The control system will allow the users to make adjustments within pre-set parameters. The contractor and/or the contractor's vendor will train users, provide appropriate training for various user skill levels (see Maintenance below), and provide users with access to training materials thereafter Construction of the 9 Jaydee Way Fire Station is expected to break ground in the spring of 2024 and be completed by the spring of 2025 The City of Lewiston (Owner) is committed to commissioning this facility to systematically optimize the building and the ancillary systems. The Commissioning Agent (CA) will provide the signed letter template and suitable documents for the required credits before the termination of the contract. The CA will be hired by the Owner and report directly to the Owner Commissioning services provide the Owner with a quality assurance process that ensures building systems, equipment, and components are installed and operate in accordance with construction documents and the Owner's goals and requirements for the success of the project. Throughout the design, construction, and early occupancy phases, the CA shall coordinate with the architect, engineer, contractor, and Owner on scheduling to integrate commissioning activities into the overall project schedule for commissioning scope as per LEED reference guide. The systems required for Commissioning include: o Central heating system and distribution o Central cooling system and distribution o Air-handling units o Terminal units, including fan-coil nits and VAV boxes o Ventilation and exhaust systems o HVAC controls o Lighting and daylighting controls o Electrical service and distribution o Electrical sub-metering o Domestic hot water systems, pumps, and controls o Renewable energy systems Questions regarding this bid content should be sent to: Allen Ward, Purchasing Agent award@lewistonmaine.gov 207-513-3040 and Nick Charneski, Clerk of the Work ncharneski@yahoo.com 207-376-7129 The Finance Committee reserves the right to waive any formality and may consider as informal any proposal not prepared and submitted in accordance with these provisions. The Finance Committee reserves the right to accept any proposal or reject any or all proposals if it is deemed to be in the public interest to do so The method of Contractor Selection has not been Determined at this time.

Conceptual

Fire / Police

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
471
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

img_map_placeholder

9 Jaydee Way, Lewiston, ME

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.