EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Butler, Pennsylvania. Completed plans call for site work for a fitness / recreation center; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Pullman Recreation Complex - Phase 1 Contract No. 1 - Base Bid - Site Construction This project involves improvements to existing Township property, including, but not limited to site preparation; unclassified bulk excavation; erosion and sediment control measures; storm sewer installation; asphalt and concrete paving; pavement line striping; concrete parking blocks; site signage; landscaping and plantings; and site restoration, complete in place. Contract No. 2 - Base Bid - Building Construction This project involves improvements to existing Township property, including, but not limited to, the construction of one (1) new concession / restroom / press box building, complete in place. Contract No. 3 - Base Bid - Electrical Construction This project involves electrical construction for the new concession / restroom I press box building, including, but not limited to, associated site and building electrical construction, complete in place. Contract No. 4 - Base Bid - Plumbing Construction This project involves plumbing construction for the new concession / restroom / press box building, including, but not limited to, associated site and building plumbing construction, complete in place. Contract No. 5 - Base Bid - HVAC Construction This project involves HVAC construction for the new concession / restroom I press box building, including, but not limited to, associated building HVAC construction, complete in place Proposals shall be delivered in a sealed envelope and clearly marked on the outside with the words "Pullman Recreation Complex - Phase 1 : Contract No. 1 - Base Bid -Site Construction" or "Pullman Recreation Complex - Phase 1 : Contract No. 2 - Base Bid - Building Construction" or "Pullman Recreation Complex - Phase 1 : Contract No. 3 - Base Bid - Electrical Construction" or "Pullman Recreation Complex - Phase 1 : Contract No. 4 - Base Bid - Plumbing Construction" or "Pullman Recreation Complex - Phase 1 : Contract No. 5 - Base Bid - HVAC Construction" Electronic copies of the Contract Documents will be made to Bidders at no charge upon request. Pennsylvania Prevailing Wages must be paid on this Project All Contractors who intend to submit a Bid must attend for the Bid to be considered as responsive. Performance and Labor and Material Payment Bonds, along with Public Liability and Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's Compensation must be filed with the executed Agreement. The Proposals must be made to Butler Township, Butler County, Pennsylvania, and shall remain firm for a period of sixty (60) days. No Bidder may withdraw his Proposal during the sixty (60) day period without forfeiting their Proposal guarantee. Proposals to receive consideration must be accompanied by a Certified Check or Bid Bond from a Surety authorized to do business in Pennsylvania, made to the order of Butler Township in an amount equal to ten (10%) percent of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within fifteen (15) days after Notice of the Award of the Contract. The Township reserves the right to award the Contracts to the lowest responsive, qualified, and responsible Bidders based on consideration of the quality of previous work, record of completing projects on time, history of payments to subcontractors and suppliers, maintenance of a permanent place of business, adequacy of equipment and plant to do the work, technical expertise, a solid financial base to guarantee contract completion and all other factors deemed relative by the Township. Bidders are advised that the Township will award the Contracts to the lowest responsible, responsive, and qualified bidders in attendance at the Mandatory Pre-Bid Meeting for the listed work categories based on the total bid submitted. However, Bidders are advised that the Township expressly reserves the right to reject all bids, and specifically reserves the right to award to the lowest responsible, responsive, and qualified Bidder a contract for all or any portions of the work listed in the Proposal, and in awarding a contract for less than the total work listed, or less than all portions of the work listed, the contract price will be determined from the total quantities for each item listed and the unit price bid for each item listed. The Township reserves the right to waive any bid informalities or to reject any or all bids. If more time is necessary for the determination of the lowest responsible bidder, the Township reserves the right to award the Contract later but not exceeding sixty (60) days from the date Bids were submitted. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Post-Bid

Fitness / Rec Centers

$300,000.00

Public - County

Paving, Site Work

61

10

13

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Openings
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furniture, Seating, Chairs, Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
56
Bidding Soon
905
All Active Projects
416
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

img_map_placeholder

100 Pullman Park Pl, Butler, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pullman Recreation Complex - Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.