BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in San Francisco, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work is at various locations in Districts 2 & 3 of San Francisco, California and consists of pavement renovation, curb ramp construction, sewer replacement, Emergency Firefighting Water System (EFWS) settlement monitoring and support work, traffic control, and all related work. 365 consecutive calendar days from NTP to Substantial Completion Class "A" license required to bid. LBE Subcontracting Participation Requirement is 25% LBE Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B If there are any questions on any Addenda that may have been issued, please contact Y T La, City and County of San Francisco, San Francisco Public Works, 49 S, Van Ness Avenue, Suite 800, San Francisco, CA 94103, telephone (628) 271-2461 or by email Y.T.La@sfdpw.org. SCOPE OF WORK A. The Contractor must prepare Traffic Control Plans, and install, operate, maintain and remove traffic control in conformance with the requirements in this section. The required traffic control work must be in place prior to the start of the construction work of the Contractor and/or any of the subcontractors. The Traffic Control Plans must clearly depict the exact sequence of the construction operation(s), the construction to be performed and the traveled way that will be utilized by all movement of traffic and pedestrians during each phase of construction. Multiple phases of construction will require a separate traffic control plan for each different construction phase or operation for working and nonworking hours. No typical Traffic Control Plans will be permitted except as approved by the Traffic Engineer. B. The Contractor or subcontractor (having Contractors Class A or Class C license issued by the State of California Contractors State License Board) may perform the Traffic Control work utilizing its own forces. If the Contractor chooses to hire a subcontractor solely to perform the Traffic Control work, subcontractor must possess a current C-31 Construction Zone Traffic Control license issued by the California Contractors State License Board. If the Contractor hires a subcontractor to perform other work, the subcontractor may perform traffic control incidental to that work. The Contractor or Subcontractor must provide sufficient traffic crews as required by the City Representative to implement and maintain the traffic control work. The Contractor or Subcontractor must provide flaggers as required by the City Representative and/or as shown on the approved Traffic Control Plans to control the vehicular traffic and to guide the pedestrians through the Construction area. Flaggers must not perform non-traffic related duties. There must be at least one (1) or more flaggers as required by the Traffic Engineer. The Traffic Crew must be comprised of at least two (2) dedicated persons. 1. Traffic Crew a. Assist in re-striping and setting up all traffic signs and other traffic control devices in accordance with the approved Traffic Control Plans. The required traffic control work must be in place prior to the start of the

Bid Results

Roads / Highways

$7,866,714.00

Public - City

Paving, Site Work

82

19

30

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
171
Bidding Soon
3,213
All Active Projects
1,322
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 26, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, San Francisco, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.