BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2024 at 8:00 PM

Updated May 16, 2024

Renovation of a stadium in Cupar, Saskatchewan. Completed plans call for the renovation of a stadium.

The scope includes the replacement and upgrade of current eavestroughs. Current trough to be replaced with a minimum 6" trough with adequate downspouts. Tender must include the removal, disposal, and installation of all new materials needed. Contractor to organize inspection of completed work with the Town of Cupar/Rink board. If there are any clarifications/questions about the project, please contact: Town of Cupar @ 306-723-4324 Mark Benko (Rink President) @ 306-718-7448 Darcy Szigli (Rink VP) @ 306-527-5677 Lowest or any tender, not necessarily accepted.

Post-Bid

Arenas / Stadiums

$30,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
16
Bidding Soon
174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

Project location map

409 Aberdeen St, Cupar, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.