BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Aylesford, Nova Scotia. Conceptual plans call for the renovation of a power facility.

The Berwick Electric Commission (BEC) owns and operates a hundred-year-old hydroelectrical facility in Factorydale, Nova Scotia which generates on average 4% of the utility's overall energy load. In early December 2023, the wicket gates and turbine vanes at the Factorydale facility were severely damaged and the plant is now out of commission. The goal of this project is to determine options to repair, replace, or to decommission and remediate the site. TIMELINE: Request for Proposals from consultants has been awarded. Scope of work includes a costed options analysis on potential remedies to the situation, and engineering consulting services in support of all phases of implementation of the chosen option. The consultant is to ensure that implementation of the Factorydale solution is completed in full compliance with project scope documents and all applicable construction and safety practices. Further project details and schedules may be confirmed fall/late 2024. *Cost to be determined.

Conceptual

Power Plant

$1,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
14
Bidding Soon
292
All Active Projects
92
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2026

img_map_placeholder

2510 Harmony Rd, Aylesford, NS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.