BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Elkview, West Virginia. Completed plans call for the renovation of a water / sewer project.

Palestine Fish Hatchery Improvements The West Virginia Purchasing Division is soliciting bids on behalf of the West Virginia Division of Natural Resources, Palestine State Fish Hatchery to establish a contract for the Rehabilitation and Modification of twenty (20) existing ponds per the attached specifications and terms and conditions. Palestine Fish Hatchery Pond Rehabilitation and New Plumbing Construction. Question Deadline 05/22/2024 at 4:00 PM ET Submit Questions to: Josh Hager 2019 Washington Street, East Charleston, WV 25305 Fax: (304) 558-3970 Email- Joseph.E.HagerIII@wv.gov The project generally consists of the Rehabilitation of the twenty (20) existing ponds on site. Many of the ponds are leaking along the outlet pipe channel and/ or through one side of the embankment. The specific plans to repair each pond are shown per the attached sheets. Ponds leaking through the embankment will use The Mixed Blanket Method for Bentonite Pond Sealant (see Attachment 5). Ponds No.3 and No.4 leak through the bottom and will use The Blanket Method for Bentonite Pond Sealant. Also, in addition, each pond requires installing a new 10-inch Waterman canal gate valve, anti-seep sand collars, installation/ plumbing of new 10-inch HDPE outlet piping into and from the concrete Catch Basins and then install new HDPE pipe from Catch Basin to the outlet near river. Most of the ponds discharge into a Catch Basin designed to capture the fish when needed and then discharge into the river via piping. As per the attached sheets, some Catch Basins will require some work to plumb the new HDEP piping into the structure. There are two new 30 ft. X 30 ft. pads that must be constructed as per the attached sheets. Also, in addition there are two existing Catch Basins that have large erosion gullies around the perimeter of the Catch Basin and require fill to be placed around the structure. This project will have a base bid that includes the repair of ponds most critical to the success of the hatchery and two alternative bids for the repair of ponds less important to the operation. Location: Wirt County, 27 Paddlefish Lane, Elizabeth, WV 26143 A. Base Bid- Pond 5 This pond leaks along the entire length of the south embankment. The south side of the embankment (200 ft.) must be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 6 piping and then to New Catch Basin Pad. The Catch Basin #56 pad will need to be constructed as per the attached details show. B. Base Bid- Pond 6 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (160 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 5 piping and then to New Catch Basin #56 pad. C. Base Bid- Pond 10 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (130 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at the appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to the existing Catch Basin #10 and then from Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in. D. Base Bid- Pond 11 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (112 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to join with Pond 12 outlet piping and then plumbed into the existing Catch Basin #12 and then from Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in. E. Base Bid- Pond 12 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (170 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to join with Pond 11 outlet piping and then plumbed into the existing Catch Basin #12 and then from Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in. F. Base Bid- Pond 14 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (116 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to the designated outlet location on the riverbank. G. Base Bid- Pond 15 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (130 ft.) should be repaired with bentonite as per the attached details show.. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to the designated outlet location on the riverbank. H. Base Bid- Pond 16 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (120 ft.) should be repaired with bentonite as per the attached details show.. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve and will be joined with Pond 25 piping and Pond 26 outlet piping through a manifold system and then plumbed into the existing Catch Basin #25 and then from the Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in. Catch Basin #25 has erosion gullies around it and will need fill material placed in and around the Catch Basin. Fill material is easily accessible on site. I. Base Bid- Pond 25 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (130 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve and will be joined with Pond 16 piping and Pond 26 outlet piping through a manifold system and then ran into the existing Catch Basin #25 and then from the Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. J. Base Bid- Pond 26 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (110 ft.) should be repaired with bentonite as per the attached details show.. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve and will be joined with Pond 16 piping and Pond 25 outlet piping through a manifold system and then ran into the existing Catch Basin #25 and then from the Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. K. Alternative Bid #1- Pond 1 This pond leaks along the entire length of the north embankment. The north side of the embankment (80 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 2 outlet piping and then plumbed into Catch Basin #1. L. Alternative Bid #1- Pond 2 This pond leaks along the entire length of the north embankment. The north side of the embankment (100 ft.) should be repaired as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 1 outlet piping and then plumbed into Catch Basin #1. M. Alternative Bid #1- Pond 3 This pond leaks along the north embankment and the bottom of the pond. The embankment will be repaired using The Mixed Blanket Method for Bentonite Pond Sealant as shown in the attached details. To fix the leaking from the pond bottom (30,000 sq. ft.) , use The Blanket Method for Bentonite Pond Sealant as the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at the appropriate interval as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve and plumbed into Catch Basin #3. N. Alternative Bid #1- Pond 4 This pond leaks along the north embankment and the bottom of the pond. The embankment will be repaired using The Mixed Blanket Method for Bentonite Pond Sealant as shown in the attached details. To fix the leaking from half of the pond bottom (35,000 sq. ft.) , use The Blanket Method for Bentonite Pond Sealant as the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at the appropriate interval as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to Pond #3. O. Alternative Bid #1- Pond 28 This pond leaks along the entire length of the south embankment. The south side of the embankment (150 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collar will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with the existing manifold that connects with Pond 29 outlet piping and Pond 30 outlet piping. Also, there is a large erosion gully below Catch Basin #30 that needs fill placed in around the Catch Basin and re-graded. P. Alternative Bid #1- Pond 29 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (150 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with the existing manifold that connects with Pond 28 outlet piping and Pond 30 outlet piping. Q. Alternative Bid #1- Pond 30 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (160 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with the existing manifold that connects with Pond 28 outlet piping and Pond 29 outlet piping. R. Alternative Bid #2- Pond 18 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (260 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with Pond 19 outlet piping and Pond 20 outlet piping and then to New Catch Basin #19 Pad. S. Alternative Bid #2- Pond 19 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (230 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with Pond 18 outlet piping and Pond 20 outlet piping and then to New Catch Basin #19 Pad. The Catch Basin #19 pad will need to be constructed as per the attached details show. T. Alternative Bid #2- Pond 20 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (240 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with Pond 18 outlet piping and Pond 19 outlet piping and then to New Catch Basin #19 Pad.

Post-Bid

Water / Sewer

$380,000.00

Public - State/Provincial

Renovation

3

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
27
Bidding Soon
351
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2024

June 27, 2024

img_map_placeholder

27 Paddlefish Ln, Elkview, WV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.