Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 30, 2024 at 8:00 PM
Updated May 31, 2024
Site work and paving for a sidewalk / parking lot in Inver Grove Heights, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
This project has a Targeted Group (TG), Economically Disadvantaged (ED), Veteran Owned (VO) preference and a 1% TGB subcontracting goal established. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. This project involves the reconstruction and expansion of existing secured Motor Vehicle Storage Compound (MVSC) with concrete pavement and concrete curb and gutter. Lighting system will be improved to illuminate the parking area. The existing pond shall be expanded South of the MVSC to receive additional runoff. The disturbed areas will be seeded and mulched. Temporary erosion control shall also be provided. Site Directions: Inver Grove Heights Minnesota National Guard Armory 8076 Babcock Trail Inver Grove Heights, MN 55077
Award
Sidewalks / Parking Lot
$728,361.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2024
June 13, 2024
8076 Babcock Trail, Inver Grove Heights, MN
Related To This Project
Inver Grove Heights, MN
Bid Date: Mar 19 2019
Inver Grove Heights, MN
Bid Date: May 28 2024
Inver Grove Heights, MN
Bid Date: Jul 17 2024
Inver Grove Heights, MN
--
Inver Grove Heights, MN
--
Inver Grove Heights, MN
Bid Date: Sep 24 2025
Inver Grove Heights, MN
--
Inver Grove Heights, MN
--
Inver Grove Heights, MN
Bid Date: May 06 2024
Inver Grove Heights, MN
Bid Date: Apr 23 2024
Inver Grove Heights, MN
Bid Date: Mar 26 2024
Inver Grove Heights, MN
Bid Date: Apr 24 2024
Inver Grove Heights, MN
--
Inver Grove Heights, MN
Bid Date: Mar 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
