Published May 17, 2024 at 8:00 PM

Updated May 22, 2024

Demolition, site work, renovation and addition to a transportation facility in Superior Township, Michigan. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

Proposals are being solicited from construction contractor and engineering consultant joint ventures, construction contractor and engineering prime/sub teams, and other teams of businesses (Proposers) for the purpose of contracting for design-build services to engineer and construct an addition to the existing Airport Rescue & Firefighting Facility (ARFF) No. 4 at Willow Run Airport (YIP). The ARFF was originally completed and opened in 1969 and has had few substantial improvements since its completion. The Apparatus Bay is no longer large enough to house modern firefighting vehicles, and a replacement station is not scheduled for completion for a few years. The Wayne County Airport Authority (WCAA or Airport Authority) has new apparatus equipment ordered for delivery in 2024, and desires to have an addition along the entire West end of the building to accommodate the new vehicles. The successful Proposer will be responsible for confirmation of existing conditions, design, and engineering of the proposed addition, including selective demolition, new addition including architectural, structural, mechanical, electrical, plumbing, and associated civil working including replacement of the adjacent driveway and associate storm sewer structure, walkways, grading and site restoration. The successful Proposer will be responsible for applying (with WCAA assistance) and paying for all necessary permits, proposing and award, construction and construction administration, quality control testing, commissioning of replacement equipment, close-out documentation, and any required warranty work. It is anticipated that construction will begin in early summer of 2024 and be Substantially Complete by the end October 2024. (The Contract resulting from this solicitation is subject to Airport Authority Prevailing Wages Requirements.) Question Deadline 05/06/2024 at 2:00 PM ET Question Deadline (purchasing.questions@wcaa.us) all emails All work selected by the Airport Authority shall be Substantially Complete on or before 10/31/2024 . Final Completion of the project shall be achieved no later than 90 days following Substantial Completion.

Post-Bid

Transportation Terminals

$810,000.00

Public - County

Addition, Demolition, Renovation, Site Work

3

9

6

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
173
Bidding Soon
2,538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

September 20, 2024

Project location map

801 Kirk Profit Dr, Superior Township, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.