BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Whittier, California. Contact the soliciting agency for additional information.

The City of Whittier invites qualified engineering consultants to submit a proposal for on call engineering design services for the preparation of plans, specifications, cost estimates, and related construction documents for street rehabilitation projects. Deadline for requests for clarifications and questions - 5:00 p.m. April 25, 2024 Any questions related to this RFP shall be submitted in writing to the City of Whittier Public Works Department at PubWks@cityofwhittier.org before 5:00 p.m. on the request for clarifications deadline of April 25, 2024. No oral questions or inquiries about the RFP shall be accepted. Any interpretation or correction of this RFP will be made only by addendum duly issued by the City. Tentative Award of Contract at City Council Meeting May 28, 2024 This RFP if for on-call engineering design services for various street rehabilitation projects from June 2024 to June 2027. To be eligible for consideration, the Proposer must provide evidence of successfully completing plans, specifications, and estimates (PS&E) for local agencies within the past five years. The selected Consultant(s) may be asked to prepare PS&E documents for locations identified in Appendix C. The PS&E documents shall conform to all current, city, state, and federal design standards for roadways. Each project shall consist of evaluating current road conditions, providing recommendations for street rehabilitation throughout the 60%, 90%, and 100% PS&E submittals, preparing final plans and specifications, construction estimates, and as-needed construction support. Consultant must perform a pavement condition survey and appoint a Geotech to provide pavement treatment recommendations for arterial and collector roads.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
106
Bidding Soon
2,268
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Whittier, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.