BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Charlottesville, Virginia. Completed plans call for the renovation of a educational facility.

Project Description: Removal of existing cooling tower including existing pump, associated piping, electrical wiring, and controls wiring. Installation of new cooling tower on new elevated piers and beams, including new associated piping, electrical wiring, and controls wiring. Modification of existing concrete pad and sump pit. Construction of new pump house containing installation of new electrical panels, transformer, pumps, variable frequency drives, electric ceiling heater, exhaust fan, including new associated piping, electrical wiring, and controls wiring. Construction of new retaining wall and new fencing surrounding new cooling tower. All inquiries for information should be directed to David Reid at reidd@charlottesville.gov Contractor Requirements: o Prior to award of contract and commencing with the work, the contractor is to submit all required insurance and bonds in accordance with the City of Charlottesville requirements. o Within ten (10) calendar days after execution of this Construction Contract, the contractor is to submit: o The Construction Schedule; o A Personnel Chart which lists by name, job category and responsibility the General Contractor's primary employees who will work on the Project; o The General Contractor's Subcontractors and Suppliers, listing by name and general Project responsibility each subcontractor and supplier who will be utilized by the General Contractor to provide goods or services with respect to the Project; and, o Compensation Schedule, to include a Schedule of Values for payment of the Contract Price on a lump sum basis. o Within fifteen (15) calendar days after execution of this Construction Contract, the contractor is to submit a submittal schedule. o The contractor shall secure and pay for all necessary bonds, permits, fees, tests and inspections. Substantial Completion ..........................................July 25, 2025

Award

Educational

$425,000.00

Public - City

Renovation

18

5

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
38
Bidding Soon
1,090
All Active Projects
463
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

June 2, 2025

img_map_placeholder

508 Harris Rd, Charlottesville, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.