Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 5, 2024 at 8:00 PM
Updated August 6, 2024
Site work for a water / sewer project in Framingham, Massachusetts. Completed plans call for site work for a water / sewer project.
Solicitation - 4017549 PROJECT SCOPE Replace chiller with an equivalent unit Refurbish chiller structural support system Install a leak detection system for the chiller Replace the condenser water pumps Add a buffer tank Add an expansion tank Install isolation control valves Install a 6" bypass line for emergency operation Replace well water pump controls Connect and commission the components to the system Replace well water pumps 1 and 2 with variable frequency drives Clean and repair wells 1 and 2 Install a refrigerant monitoring system with integration into the building management system This project is scheduled for 365 calendar days to substantial completion and in general includes: Replace chiller with an equivalent unit; Refurbish chiller structural support system; Install a leak detection system for the chiller; Replace the condenser water pumps; Add a buffer tank; Add an expansion tank; Install isolation control valves; Install a 6" bypass line for emergency operation; Replace well water pump controls; Connect and commission the components to the system; Replace well water pumps 1 and 2 with variable frequency drives; Clean and repair wells 1 and 2; Install a refrigerant monitoring system with integration into the building management system Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Deadline 5/29/24 Time 11:00 A.M. The Contractor shall commence the Work under this Contract on the date specified in the written “Notice to Proceed,” and shall, within 150 days after such date, bring the Work to Substantial Completion and to the point at which a Certificate of Agency Use and Occupancy may be issued, and shall bring the Work to Final Acceptance within 45 days after the date specified for Substantial Completion
Bid Results
Water / Sewer
$1,173,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2024
June 28, 2024
400 Worcester Rd, Framingham, MA
Related To This Project
Framingham, MA
Bid Date: Jun 12 2024
Framingham, MA
Bid Date: May 17 2024
Framingham, MA
Bid Date: Jun 06 2024
Framingham, MA
--
Framingham, MA
--
Framingham, MA
Bid Date: Jul 11 2024
Framingham, MA
Bid Date: Jun 24 2024
Framingham, MA
Bid Date: Jun 07 2024
Framingham, MA
Bid Date: May 06 2024
Framingham, MA
Bid Date: May 06 2024
Framingham, MA
Bid Date: May 01 2024
Framingham, MA
Bid Date: Apr 03 2024
Framingham, MA
Bid Date: Apr 29 2024
Framingham, MA
Bid Date: Apr 18 2024
Framingham, MA
Bid Date: Apr 11 2024
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
