Published August 5, 2024 at 8:00 PM

Updated August 6, 2024

Site work for a water / sewer project in Framingham, Massachusetts. Completed plans call for site work for a water / sewer project.

Solicitation - 4017549 PROJECT SCOPE Replace chiller with an equivalent unit Refurbish chiller structural support system Install a leak detection system for the chiller Replace the condenser water pumps Add a buffer tank Add an expansion tank Install isolation control valves Install a 6" bypass line for emergency operation Replace well water pump controls Connect and commission the components to the system Replace well water pumps 1 and 2 with variable frequency drives Clean and repair wells 1 and 2 Install a refrigerant monitoring system with integration into the building management system This project is scheduled for 365 calendar days to substantial completion and in general includes: Replace chiller with an equivalent unit; Refurbish chiller structural support system; Install a leak detection system for the chiller; Replace the condenser water pumps; Add a buffer tank; Add an expansion tank; Install isolation control valves; Install a 6" bypass line for emergency operation; Replace well water pump controls; Connect and commission the components to the system; Replace well water pumps 1 and 2 with variable frequency drives; Clean and repair wells 1 and 2; Install a refrigerant monitoring system with integration into the building management system Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Deadline 5/29/24 Time 11:00 A.M. The Contractor shall commence the Work under this Contract on the date specified in the written “Notice to Proceed,” and shall, within 150 days after such date, bring the Work to Substantial Completion and to the point at which a Certificate of Agency Use and Occupancy may be issued, and shall bring the Work to Final Acceptance within 45 days after the date specified for Substantial Completion

Bid Results

Water / Sewer

$1,173,000.00

Public - State/Provincial

Site Work

18

14

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
758
Active Projects
430
Bidding Soon
4,064
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

June 28, 2024

Project location map

400 Worcester Rd, Framingham, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.