BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Longview, Washington. Completed plans call for the renovation of a educational facility.

TITLE: Longview School District Minor Modifications and Repairs ESTIMATED BASE QUOTE COST RANGES: $132,000 - $142,000 ABBREVIATED PROJECT DESCRIPTION: Cascade Middle School: Replacement of handrail at exterior concrete stair and repair of spalling concrete at handrail post connections. Columbia Valley Garden Elementary School: Interior TI of existing space including replacement of gypsum wallboard, ceiling tiles, and lighting as well as new paint and wall base. Discovery High School: Interior TI to convert two rooms into offices; demo casework, add data ports, repair and paint ceilings, patch and paint walls, add wood doors, frame, and hardware. Kessler Elementary School: Interior TI to update two staff restrooms with new flooring, lighting, sinks, faucets, and wall finishes; new vanities are an alternate. Monticello Middle School: Interior TI to replace plastic laminate window sills/counters with solid surface sills/ counters; patch and repair wall finishes. Please direct questions regarding this project to the office of the project representative, Jason Olson at LSW Architects, 610 Esther Street, Suite 200, Vancouver, WA 98660; telephone (360) 694-8571. No contractor may withdraw his bid after the hour and date set for the submittal thereof, or thereafter, before award of the Contract, unless award is delayed for a period exceeding thirty (30) days from the proposal submittal date. The Owner reserves the right to accept or reject any or all proposals and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time for Completion: The Work to be performed under this Contract shall commence as soon as the Contractor has been officially notified to proceed. On-site Work shall not begin until June 20, 2024, except for the window sill mockup at Monticello Middle School which may take place after 3:00 pm M-T-Th-F and after 2:00 pm Wednesdays until June 20, 2024 when the site will be fully available. All Work shall be complete by August 19, 2024.

Post-Bid

Educational

$142,000.00

Public - City

Renovation

10

16

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
25
Bidding Soon
603
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 20, 2024

img_map_placeholder

Multiple Locations, Longview, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.