BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Weatherford, Texas. Completed plans call for site work for a water / sewer project.

Kelly Ranch Public Water Supply Wells Phase 3. SPECIFICATIONS: The materials and methods of construction of all work within the scope of this proposal shall be governed by the current Parker County Standard Specifications for water construction. For items not addressed by Parker County Standard Specifications, the North Central Texas Council of Governments (NCTCOG) Standard Specifications for Public Works Construction shall apply. Any reference to TxDOT specifications shall mean the Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, current addition. Scope All Questions Must Be Sent to Chucks@barronstark.com. SCOPE OF WORK: The work for this project consists of furnishing all materials, labor, equipment, tools and incidentals to construct the water improvements in accordance with the plans and specifications "Kelly Ranch Public Water Supply Wells Phase 3" complete in its entirety without exception. Owner as liquidated damages for each day of such delay the sum of Two Hundred and Fifty Dollars ($250.00), it being understood between the parties here to that the sum shall be treated as liquidated damages and not as a penalty and the Owner may withhold from the Contractor's compensation such sums as liquidated damages. The Proposal (s) shall be for the furnishing of all labor, materials, and equipment for performing all work required for the construction of the Kelly Ranch Townhomes Water Line Extension Improvements. A performance bond, payment bond, and maintenance bond in the amount of not less than one hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials WILL be required by the Cresson Crossroads MUD No. 2. The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of sixty (60) days from the date bids are opened. Barron-Stark Engineers, LP

Post-Bid

Water / Sewer

$2,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
57
Bidding Soon
3,329
All Active Projects
1,316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

July 2, 2024

img_map_placeholder

To Be Determined, Weatherford, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.