BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2024 at 8:00 PM

Updated May 23, 2024

Site work for a bridge / tunnel in Milaca, Minnesota. Completed plans call for site work for a bridge / tunnel.

culvert replacement in Bogus Brook Township. The township will provide the new culverts. Sections 13, 14, 15, 23--Addresses are approximate. Sites are marked with laths and blue tape. Site 1: Sec 14, 6293 110th St, remove and dispose of existing culvert, install approx. 32 12 dual wall grade to drain, move extra dirt to Site 3. Site 2: Sec 13, 10657 57th Ave, remove and dispose of existing culvert, install approx. 38 15 dual wall grade to drain, move extra dirt to Site 3. Site 3: Sec 13, 10576 105th St, remove and dispose of existing culvert, install approx. 40 15 dual wall, use extra dirt to grade over culvert. Site 4: Sec 14, 5901 105th St, remove and dispose of existing culvert, install approx. 40 12 dual wall. Site 5: Sec 23, 9853 65th Ave, remove and dispose of existing culvert, install approx. 40 15 dual wall. Site 6: Sec 15, 7671 100th St, remove and dispose of existing culvert, install approx. 40 18 dual wall. The Board maintains the right to accept or reject any or all quotes. Contractor agrees to defend, indemnify, and hold Bogus Brook Township harmless for all claims relating to the contractors performance of the contract. Selected contractor must sign contract and provide a W-9 form.

Award

Bridges / Tunnels

$4,551.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
122
Bidding Soon
1,450
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

June 7, 2024

Project location map

Multiple Locations, Milaca, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.