Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2024 at 7:00 PM

Updated March 19, 2024

This is a service / maintenance or supply contract in Milaca, Minnesota. Contact the soliciting agency for additional information.

QUOTES for up a minimum of 4,000 cubic yards up to a maximum of 7,000 cubic yards of Class 5 aggregate surfacing (per MNDOT Specification 3138). The aggregate gradation shall be modified to 7% to 12% clay content by weight passing the 200 sieve. Gravel shall be delivered, windrowed, spread, and packed upon designated Township roads, as ordered, by September 1, 2024. Gravel delivery and packing must be performed according to specifications of the Town Board, available from the Clerk. Specifications include spreading and packing all gravel within 12 hours of delivery. Quotes will be read at the Regular Board Meeting held that evening. The Page Township Board reserves the right to reject any or all quotes. Selected contractor must sign contract and provide W-9. Contact Kyle Weimann, Township Clerk at 320-247-5030 or clerk@PageTownship.org. All work must be billed in a single invoice and submitted with scale tickets for each load delivered and gravel analysis for each day of hauling. Include with quotes a description of equipment to be used.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
100
Bidding Soon
1,641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

April 18, 2024

Project location map

Multiple Locations, Milaca, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed