BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2024 at 8:00 PM

Updated July 19, 2024

Site work, paving and new construction of a bridge / tunnel in East Weymouth, Massachusetts. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction and placement of a prefabricated 130-foot span pedestrian bridge over the Herring Run Brook in Weymouth, Massachusetts located at 1250 Commercial Street (Lovell Field). Question Deadline 05/10/2024 at 3:00 PM ET All answers will be in the form of an addendum and sent to registered Bidders by 5/17/24 @ 3:00 P.M. All questions are to be sent to procurement@weymouth.ma.us. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Award

Bridges / Tunnels

$798,544.00

Public - City

New Construction, Paving, Site Work

21

6

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
108
Bidding Soon
3,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

November 15, 2024

Project location map

1250 Commercial St, East Weymouth, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.