Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 6, 2024 at 8:00 PM

Updated June 7, 2024

Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Scope of Work: Contractor will be responsible for all labor, materials, equipment, coordination and incidentals necessary to complete work as described in the Contract Documents. The work to be performed generally includes, but is not limited to the following: Location of Work: Along abandoned Brighton Canal (about 2350 South) 2600 West to Redwood Road. 1. Installation of storm drain, including pipe and boxes, and removal of existing pipe, boxes, and culvert. 2. Other work normally encountered during construction on improved and unimproved properties. Bidders are not required to be pre-qualified for this project. To Proceed. It is anticipated that Notice to Proceed will be given on Monday, June 10, 2024. The work will be substantially completed 150 Calendar Days from the date of the Notice to Proceed. A pre-bid conference will not be held.

Bid Results

Water / Sewer

$2,064,887.00

Public - City

Site Work

35

13

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
70
Bidding Soon
1,203
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 10, 2024

Project location map

Multiple Locations, West Valley City, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed