Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2025 at 8:00 PM

Updated December 11, 2025

Renovation of a water / sewer project in Winthrop, Massachusetts. Design plans call for the renovation of a water / sewer project.

As of March 17, 2025, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Massachusetts Water Resources Authority requests qualifications statements and proposals from qualified firms interested in providing design and engineering services during construction for the Deer Island Treatment Plant Combined Heat and Power System in Boston, Massachusetts. Question Deadline 05/16/2024 at 2:30 PM ET

Design

Water / Sewer

$395,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
722
Active Projects
325
Bidding Soon
4,911
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

190 Tafts Ave, Winthrop, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed