EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in New Cumberland, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project is anticipated to be awarded by the New Cumberland Borough Council at their regularly scheduled meeting on Wednesday, June 12, 2024, for construction of the following Project: "3rd Avenue Street Improvement Project" New Cumberland Borough Cumberland County, PA The work of the base bid of this project consists of milling and overlay and full-depth roadway reconstruction, installation of thermoplastic decorative pavement markings, curb, sidewalk, and concrete construction, design and installation of ADA curb ramps, and installation of site amenities. The work of the alternate bids of this project consists of additional sidewalk reconstruction and thermoplastic pavement marking. Liquidated damages apply at the rate of $500.00 per calendar day. Questions regarding the specifications shall be submitted online . Questions submitted after 5:00 PM on May 8, 2024, will not be answered. Each bid must be accompanied by a bid bond or certified check made payable to "New Cumberland Borough" in the amount of 10% of the total bid in accordance with the Instructions to Bidders. The successful bidder shall provide a performance bond or certified check to the municipality in the amount of 100% of the contract within 15 days after the contract is awarded. Work must be performed to ensure that non-discrimination/sexual harassment provision of the contract documents and the CFA are met. The work shall also conform to the requirements of the federal Davis Bacon Act. Substantial completion shall be Friday, October 25, 2024, and completion of work and final pay shall be Friday, November 1, 2024. The Owner hereby reserves the right to reject any and/or all proposals submitted. The Owner also reserves the right to waive any defects, errors, omissions, irregularities, or informalities in the proposals received. All bids shall be irrevocable for sixty (60) days after the bid opening date. Bid Result - Rogele, Inc - BASE BID (USING ITEM 3A) $ 316,598.30 BASE BID (USING ITEM 3B) $ 329,238.30

Bid Results

Roads / Highways

$645,836.00

Public - City

Paving, Site Work

8

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Finishing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
106
Bidding Soon
1,443
All Active Projects
635
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2024

July 16, 2024

img_map_placeholder

3rd Ave, New Cumberland, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

3rd Avenue Street Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.