BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in El Dorado, Arkansas. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The project consists of constructing concrete foundation and containment walls, installation of two (2) six thousand one hundred fifty (6,150) gallon crosslinked polyethylene vertical tanks, construction of a steel framed and sheeted canopy over the tank containment, chemical pumps, piping and controls with associated valves, fittings, and appurtenances to deliver 12.5%liquid sodium hypochlorite as a pre and post-storage disinfection agent to the potable water system. Demolition of the existing chlorine gas storage and delivery system is not included in this project. Contractor's Bid shall be accompanied by a Bid Bond from a reliable surety company in an amount not less than five percent (5%) Total Base Bid. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wages to be paid under the Contract. Bidders must be licensed in compliance with Arkansas Contractors Licensing Law. Bidders must be pre-qualified by Owner/Engineer prior to Bid Opening. The right is reserved to reject any and all Bids and to waive any defects in Bids received. Bidders must be licensed in compliance with the Arkansas Contractor's Licensing Law found in Arkansas code 17-25-101, etc. Any contract awarded under this invitation forbids will be subject to the requirements of the State of Arkansas Competitive Sealed Bidding as described in the contract documents. Question Deadline 05/17/2024 All questions about the meaning or intent of the Contract Documents are to be directed in writing to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten (10) days prior to the data for opening of Bids may not be answered.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$578,904.00

Public - City

New Construction, Site Work

10

19

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
150
All Active Projects
73
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, El Dorado, AR

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.