BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Nitro, West Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of july 10,2024 The project was awarded to Paving Solutions with a bid of $149,751.25 The City of Nitro is soliciting sealed bids for paving for the following: Mill all areas to be paved 2 Inches in depth; haul milled materials off from site; clear area of loose debris and vegetation; apply tack coat for bonding; place and compact 2 Inches of wearing 1 asphalt in prepared areas; completed by June 25, 2024. The following are to be paved: Easter Road two sections house number 37-16 1/2 feet wide & 93 1/2 feet long Easter Road house 101-eleven feet wide and 75 feet long needs filled and paved Easter Road down from house 20-twelve feet wide & 100 feet long Easter Road last one-eleven feet wide & 98 feet long 33rd St. right side from 1st Ave. to 2nd Ave.-10 feet wide & 367 feet long 23rd St. 1st Ave. to 2nd Ave.-29 ft. wide & 367 feet long 25th St. 1st Ave. to middle 27 feet wide & 187 feet long (the new business location) 3rd Ave. west down from post office-house 2438 to 2437-17 feet wide & 98 feet long 3rd Ave. west down from post office-house 2835 to stop sign-18 feet wide & 424 long 11th St. house 1126 to 3rd Ave. and fan out on both sides-10 feet wide & 84 feet long to curb on 3rd Ave.-fan out where the X's are 12th St. entrance from 1st Ave.-eleven feet wide & 6 1/2 feet long 12th St. from house 1232 to top at wall 27 ft. wide x 163 long-flare out at the top 51 feet wide-at house 1234-Remove 8 inches deep and put back in four inches of stone, four inches of base and a 2 inch cap 9th St. house 926 to 3rd Ave. and fan out on both sides-9 feet wide & 28 feet long to curb on 3rd Ave.-fan out on both sides where the X's are-Fix curb on right side 3rd Ave. east 13th St. to 12th St.-6 1/2 feet wide & 19 feet long 3rd Ave. east 10th St. to 9th St.-6 1/2 feet wide & 60 feet long 8th St. at top to 3rd Ave. 11 feet wide and fan out X to X 58 feet 6th St. at top to 3rd Ave. 11 feet wide and fan out X to X 55 feet 5th St. at top to 3rd Ave. 11 feet wide and fan out X to X 50 feet long X to X Entrance to Erwin Drive-one section marked with X 11 feet wide and 182 feet long Entrance to Martins Court-X to X at Benamatti is 20 feet wide-29 feet back and 10 feet wide Entrance to Holly St. at highway-fan out 55 feet X to X in front-29 feet back1/47 feet wide Valentine Circle entrance fan out 35 feet X to X in front and go back 52 feet-25 feet wide Intersection at the Nazarene Church at the corner of Valentine Circle and Sattes Circle where the orange xx are-two measurements 42x24 and 20x18 mill out two inches deep and put back int two inches and raise drain to accommodate paving Sattes Circle house 1444 to 1448 15 feet wide and 140 feet long . For more information email: rcox@cityofnitro.org

Award

Roads / Highways

$149,751.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
41
Bidding Soon
418
All Active Projects
159
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 17, 2024

img_map_placeholder

Multiple Locations, Nitro, WV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.