BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 19, 2025

Site work and paving for a road / highway in Nitro, West Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Your bid will be all inclusive - labor, equipment, milling, tie-ins and 2-inch asphalt unell otherwise noted. The noted streets below have been dotted on paint to show the beginning & end of each section. Please show the total cost of each street. We may do half this spring and half this the fall. One section on County Road - number 79-10 x 250. One section on Michigan Ave South above St. Albans bridge where drain was replaced - number 87-12x20. Replace with 4 inches of asphalt. One section on Dpont Av So above the St. Albans bridge where drain was replaced - number 83-12 x 80. Kanawha Ave at the end of Kapok St that has never been paved. 16 ft wide x 200 ft length (priority). 15th St. East on 3rd Ave - number SO-pave 15th St. to 17 St. 15 x 360 Top of Short St. one large section (priority) - number 66 - 13 x 310 9th St. entrance from 1st Ave - number 62-16 x 16 and from house number 921 top of bank and flare out - number 62-26 x 180 (PRIORITY) 12th St. entrance - number 54-32 x 24 12th St. from house number 1223 to 1232 - number - 58-26 x 250 - this section should have one to two inches of gravel for a better base (PRIORITY). 15th St. entrance from 1st Ave - number 46-26 x 36-2inch asphalt - go to house number 1505 - number 46 - excavate full depth area and install 6 inches of stone base - 27 x 160 - with 4 inch of asphalt (PRIORITY). 19th St. at crossing and near 2nd Ave one large section - number 42-10 x 32 16 St. at top of 3rd Ave to wall and flare out number - 70-16 x 50 20th St. from 2nd Ave to end the fronier building - number 38-38 x 330 22nd St. from 1st Ave back to new pavement-number 34-24 x 100 23rd St. from 1st Ave to 2nd Ave - number 30-32x390 24th St. new turn-around from turn around to 2nd Ave will be done this fall or spring 2026 25th St. from 1st Ave up to construction ends (maybe fall) - number 26-30 x 170 29th St. entrance from 1st Ave - number 22-26 x 40 32nd St entrance to end of go mart number 18-25 x 120 35th St entrance and both sides to 2nd Ave number 10-each section 10 x 200 36th St entrance from 1st Ave - number 14 - 24x28 38th St. to 39th St on 2nd Ave one large section needs paved-number 6-10 x 203 9th St entrance-number 2-26 x 80 31st East several sections marked them starting with one through four section one-12 x 40, Section two-15 x 170, Section three to house 100-13 x 20, Section four-12 x 230.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
41
Bidding Soon
809
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

May 19, 2025

Project location map

Multiple Locations, Nitro, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.