BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2024 at 8:00 PM

Updated May 10, 2024

Site work and paving for a mixed-use development in Raritan, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project involves improvements to Colby Avenue, Berwick Street and Arnold Avenue (3,200 LF, intersection of Woodmere Street and Colby Avenue to intersection of Woodmere Street and Arnold Avenue. The work includes approximately 10,825 SY milling & 1,305 Tons 9.5M64 Surface Course. Base repair will be determined by the Borough Engineer after milling operations. Concrete work consists of 2,810 LF of curb and 935 SY of sidewalk and 480 SY of aprons installed in conformance with ADA Standards. Storm sewer structures are scheduled to be reconstructed in accordance with NJDEP Storm Water Regulations. BID SECURITY: Bid Security is required in an amount of not less than ten percent (10%) of the total amount of the Bid, but not in excess of Twenty Thousand Dollars ($20,000.00) as set forth in N.J.S.A. 40A:11-21 CONSENT OF SURETY: Certificate from a Surety Company is required indicating consent to be bound as surety and guarantor for performance required under the Contract Documents. The Borough of Raritan reserves the right to reject any or all Bids, or to waive any Bid defect where such defect is not detrimental to the best interest of Borough of Raritan and fairness of the bidding process. The right is also reserved to increase or decrease the quantities specified in the manner designated in the Contract Documents. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Such inquiries or notices must be in writing and must be received by the Engineer at least ten (10) days prior to the date fixed for the opening of bids, weekends and holidays excepted. Inquiries which are received less than ten (10) days prior to the date fixed for the opening

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

18

5

11

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
1,178
Active Projects
592
Bidding Soon
7,821
All Active Projects
3,568
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, Raritan, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.